Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02210.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />August 25, 2016  <br />  <br />  <br />  <br />Page 3  <br />3.3. Native Material  <br />For the remediation of shafts greater than 25 feet, which are currently backfilled with native  <br />material, CONTRACTOR shall  excavate  the  current  native  backfill  to  a  depth  of  25  feet  <br />below Soil Liner Fill subgrade elevation. The surface of the native material at this elevation will  <br />then  be  compacted  using  a  method specification  that  results  in a  firm  surface  that  will  be  <br />approved  by CERTIFYING  ENGINEER.  CONTRACTOR shall  then  remediate  the  underground  <br />working  using  Coarse  Shaft  Backfill,  Cement  Plug, and Cemented Rockfill as shown on the  <br />DRAWINGS.  <br />3.4. Blasting  <br />The CONTRACTOR shall compact the surface of the area that has been blasted. If the blasted  <br />surface is below the Soil Liner subgrade elevation, the CONTRACTOR shall compact the blasted  <br />surface  using  a  method  specification  approved  by  the CERTIFYING  ENGINEER,  and  then  <br />remediate according to  the DRAWINGS to achieve the design grades  and  elevations. If  the  <br />blasted surface is above the Soil Liner subgrade elevation, the CERTIFYING ENGINEER assess  <br />the foundation conditions and  recommend whether the CONTRACTOR shall over excavate and  <br />backfill with Cemented Rockfill and Structural Fill, or if the CONTRACTOR shall remove excess  <br />material and compact the final grade surface using a method specification approved by the  <br />CERTIFYING ENGINEER.  <br />