Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 19  <br />all  grade  markers  under  supervision  of  CQA  Monitor  after  verification  <br />measurements have been approved by MANAGER and CERTIFYING ENGINEER and  <br />will  backfill  holes  with  Drain  Cover  Fill.  Areas  with  deficient  thickness  shall  be  <br />reworked  by CONTRACTOR,  until  acceptable  measurements  are  obtained.  If  <br />MANAGER or CERTIFYING ENGINEER suspects the occurrence of any damage to the  <br />underlying geosynthetics, MANAGER will instruct CONTRACTOR to remove Drain  <br />Cover  Fill  to  expose  the  geosynthetics. CONTRACTOR shall  uncover,  repair  any  <br />observed damage of the underlying geosynthetics, in accordance with the repair  <br />requirements  of  Sections  02776.0 and  02777.0  of  these  SPECIFICATIONS  and  <br />recover, at no cost to CC&V.  <br />10. CONTRACTOR will  provide  adequate  illumination  as  approved  by MANAGER,  if  <br />Drain Cover Fill placement is carried out at night. A minimum of 2‐foot candles  <br />measured at the synthetic liner shall be used when Drain Cover Fill placement is  <br />carried out at night    <br />I. Pipe Bedding Material  <br />1. Pipe bedding material shall be placed around the CSP as shown on the drawings.  <br />2. For piping external to the valley leach facility, CONTRACTOR shall compact the Pipe  <br />Bedding Material requiring compaction to at least 95 percent of the maximum dry  <br />density as determined by the Standard Proctor density test (ASTM D698), and a  <br />moisture  content  3  percent  below  and  3  percent  over  the  optimum moisture  <br />content.  <br />3. CONTRACTOR shall place Pipe Bedding Material in maximum 12‐inch loose lifts.  <br />Pipe Bedding Material will be worked under pipe haunches by hand to provide  <br />uniform support of the CSP.  <br />4. Native material used for backfilling CSP excavation shall be placed in 12‐inch to 18‐ <br />inch loose lifts, and compacted by wheel rolling with light, rubber tired or other  <br />light compaction equipment, as approved by CERTIFYING ENGINEER.  <br />J. Granular Filter Material  <br />1. Granular  Filter  Material  shall  be  placed  beneath  the  Riprap  as shown  on  the  <br />drawings.  <br />K. Bedding Fill  <br />1. Bedding Fill shall be placed within the limits of the valley leach facility as shown on  <br />the DRAWINGS.  <br />2. CONTRACTOR shall place and compact the Bedding Fill in loose lifts such that the  <br />compacted lift thickness is a minimum of 12‐inches. CONTRACTOR shall condition  <br />the Bedding Fill to allow a surface that does not cause rutting or other deleterious  <br />effects. The moisture content and density shall be uniform throughout the lift. If a