Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 20  <br />lift of compacted Bedding Fill dries out during placement operations, CONTRACTOR  <br />shall  scarify,  moisture  condition  the  dry  soil  and  recompact  the  lift.  If  a  lift  of  <br />compacted Bedding Fill becomes overly wet due to precipitation or over watering,  <br />CONTRACTOR shall  allow  the  wet  soil  to  dry  to  the  specified  moisture  content  <br />range before recompaction of fill and placement of geosynthetic materials.  <br />3. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing.  <br />Bedding Fill sampling shall be scheduled by CQA Monitor with CONTRACTOR to  <br />facilitate CQA field testing.  <br />4. CONTRACTOR shall trim the surface of the Bedding Fill to the design grades shown  <br />on the DRAWINGS.  <br />5. CONTRACTOR shall roll the surface of the Bedding Fill with a smooth drum roller to  <br />remove  ridges  and  surface  irregularities  greater  than  0.5  inches  in  height.  <br />CERTIFYING ENGINEER shall determine if surface preparation is sufficient to place  <br />geomembrane. On areas with slopes steeper than 3H:1V, CONTRACTOR shall adopt  <br />methods as necessary to obtain the same final surface preparations that would be  <br />obtained by the passage of a smooth‐drum roller on flat or level ground. Pushing of  <br />compaction equipment by tracked equipment shall not be performed. Wheel ruts  <br />on the surface of the Bedding Fill from grading equipment shall be repaired by  <br />CONTRACTOR prior to placement of the geomembrane by rolling the surface as  <br />approved by CQA Monitor. CONTRACTOR shall take  whatever  steps  necessary  to   <br />prepare  Soil  Liner  Fill  surface  to  the  satisfaction  of MANAGER and CERTIFYING  <br />ENGINEER, at no additional cost to CC&V.  <br />6. CONTRACTOR shall maintain the Bedding Fill surface in a condition suitable for  <br />geomembrane installation as specified in these SPECIFICATIONS and in the CQA  <br />Plan  until  the  surface  is  covered. CONTRACTOR shall  repair  all  weather  related  <br />damage to Bedding Fill surfaces or other portions of the Work that have or have not  <br />been covered by geomembrane, at no additional cost to CC&V.  <br />If any moisture is allowed to collect under the geomembrane prior to or after final  <br />seaming  and  softens  the  Bedding  Fill,  the  geomembrane  shall  be removed  and  <br />CONTRACTOR shall  recondition  and  recompact  the  Soil  Liner  Fill  to  meet  all  <br />placement and trimming SPECIFICATIONS, at no additional cost to CC&V.  <br />7. CONTRACTOR shall  remove  all  hubs  and  survey  stakes  in  the  Bedding  Fill  and  <br />backfill all holes with MANAGER and CERTIFYING ENGINEER approved material.  <br />8. CONTRACTOR shall  verify  the  final  thickness  of  Bedding  Fill  to  determine  <br />compliance with this SPECIFICATION. CONTRACTOR shall record as part of the as‐ <br />built  documentation  the  location,  elevation,  and  thickness  of  each  Bedding  Fill  <br />verification test. CQA Monitor will witness all verification measurements.  Areas  <br />with  deficiencies  shall  be  reworked  by CONTRACTOR,  until  acceptable  <br />measurements are obtained at no additional cost to CC&V. If tests indicate the