Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 17  <br />shall  recondition  and  recompact  the  Soil  Liner  Fill  to  meet  all placement and  <br />trimming SPECIFICATIONS, at no additional cost to CC&V.  <br />15. CONTRACTOR shall remove all hubs and survey stakes in the Soil Liner Fill and  <br />backfill all holes with MANAGER and CERTIFYING ENGINEER approved moisture‐  <br />conditioned Soil Liner Fill or bentonite. Compact with a Proctor hammer or other  <br />suitable device that will achieve a kneading type of compaction and will achieve the  <br />required density.  <br />16. CONTRACTOR shall  verify  the  final  thickness  of  Soil  Liner  Fill  to  determine  <br />compliance with this SPECIFICATION. Thickness verification shall be performed at a  <br />minimum  frequency  of  two  measurements per acre using a soil‐coring  device,  <br />unless directed otherwise by MANAGER. CONTRACTOR shall record as part of the  <br />as‐built documentation the location, elevation, and thickness of each Soil Liner Fill  <br />verification  test.  CQA  Monitor  will  witness  all  verification  measurements.  <br />CONTRACTOR shall backfill all holes with MANAGER and CERTIFYING ENGINEER  <br />approved moisture‐ conditioned Soil Liner Fill compacted with a Proctor hammer or  <br />other  suitable  device  that  will  achieve  a  kneading  type  of  compaction  and  will  <br />achieve  the  required  density,  or  bentonite.  Areas  with  deficiencies  shall  be  <br />reworked  by CONTRACTOR,  until  acceptable  measurements  are  obtained  at  no  <br />additional cost to CC&V.  <br />17. If tests indicate the Work does not meet the requirements of the SPECIFICATIONS,  <br />MANAGER and CERTIFYING  ENGINEER will  establish  the  extent  of  the  <br />nonconforming area. The nonconforming area shall be reworked  by  CONTRACTOR  <br />until acceptable test results are obtained at no additional cost to CC&V  <br />18. Prior to any geosynthetics being placed on Soil Liner Fill, the area will be tested by  <br />CQA Monitor. No geosynthetics will be allowed to be placed on frozen material, as  <br />defined in Section 3.06, without the area in question being retested by the CQA  <br />Monitor.  <br />H. Drain Cover Fill  <br />1. Drain Cover Fill shall be placed over the geomembrane in the locations shown on  <br />the DRAWINGS.  <br />2. Prior to placing the Drain Cover Fill, CONTRACTOR shall verify by visual inspection  <br />that  the  underlying  geosynthetics  are  free  of  holes,  tears,  wrinkles,  or  foreign  <br />objects. MANAGER and CERTIFYING ENGINEER will inspect the geosynthetic for  <br />wrinkles  prior  to  placement  of  Drain  Cover  Fill.  As  instructed by MANAGER,  <br />CONTRACTOR shall  "work  out"  wrinkles  to  the  satisfaction  of MANAGER and  <br />CERTIFYING  ENGINEER prior  to  placement  of  the  Drain  Cover  Fill.  In  all  cases,  <br />wrinkles shall not be of a size that they could fold back on themselves. Wrinkles  <br />greater than one foot shall be removed and repaired by the INSTALLER.