My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-31_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-08-31_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 3:51:10 PM
Creation date
10/25/2016 1:35:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/31/2016
Doc Name
Specifications - Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR78
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02200.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />June 15, 2016 <br /> <br /> <br /> <br />Page 16 <br />9. CONTRACTOR shall compact corners and other areas inaccessible to driven <br />compaction equipment using hand‐operated 500‐pound vibratory plate or vibratory <br />smooth‐drum compaction equipment approved by MANAGER and CERTIFYING <br />ENGINEER. <br />10. CONTRACTOR shall trim the surface of the Soil Liner Fill to the design grades shown <br />on the DRAWINGS. <br />11. CONTRACTOR shall roll the surface of the Soil Liner Fill with a smooth drum roller <br />to remove ridges and surface irregularities greater than 0.5 inches in height. <br />CERTIFYING ENGINEER shall determine if surface preparation is sufficient to place <br />geomembrane. On areas with slopes steeper than 3H:1V, CONTRACTOR shall adopt <br />methods as necessary to obtain the same final surface preparations that would be <br />obtained by the passage of a smooth‐drum roller on flat or level ground. Pushing of <br />compaction equipment by tracked equipment shall not be performed. Wheel ruts <br />on the surface of the Soil Liner Fill from grading equipment shall be repaired by <br />CONTRACTOR prior to placement of the geomembrane by rolling the surface as <br />approved by CQA Monitor. <br />12. CONTRACTOR will remove angular protruding rocks greater than 3/4 inches in <br />diameter from the compacted Soil Liner Fill surface. Indentations left in the Soil <br />Liner Fill Surface after removal of the rocks shall be filled with Soil Liner Fill or other <br />suitable fill approved by CQA Monitor, and compacted to achieve final grade. Areas <br />of the Soil Liner Fill surface with concentrated gravelly areas will have suitable fill <br />approved by CQA Monitor placed on top and compacted to achieve final grade. A <br />maximum thickness of 0.5 inches of suitable fill will be placed on the Soil Liner Fill. <br />13. MANAGER and CERTIFYING ENGINEER will identify any areas of significant <br />desiccation, crusting, or erosion of a lift surface. Soil Liner Fill surfaces found to <br />have desiccation cracks greater than 0.25‐inches in width or depth, or which exhibit <br />swelling, heaving or other similar conditions shall be replaced or reworked by <br />CONTRACTOR to remove such defects. Desiccation cracks on the Soil Liner Fill <br />surface less than 0.25‐inches in width or depth shall be compacted with a smooth <br />drum roller. CONTRACTOR shall take whatever steps necessary to prepare Soil Liner <br />Fill surface to the satisfaction of MANAGER and CERTIFYING ENGINEER, at no <br />additional cost to CC&V. <br />14. CONTRACTOR shall maintain the Soil Liner Fill surface in a condition suitable for <br />geomembrane installation as specified in these SPECIFICATIONS and in the CQA <br />Plan until the surface is covered. CONTRACTOR shall repair all weather related <br />damage to Soil Liner Fill surfaces or other portions of the Work that have or have <br />not been covered by geomembrane, at no additional cost to CC&V If any moisture <br />is allowed to collect under the geomembrane prior to or after final seaming and <br />softens the Soil Liner Fill, the geomembrane shall be removed and CONTRACTOR
The URL can be used to link to this page
Your browser does not support the video tag.