Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 15  <br />CERTIFYING  ENGINEER approved  portion  of,  excavation  and  Structural  Fill  <br />placement in the valley leach facility.  <br />2. CONTRACTOR shall  process,  place  and  compact the  Soil  Liner  Fill  to  achieve a  <br />coefficient of permeability of less than 1x10‐6 cm/sec, measured according to ASTM  <br />Method  D5084,  Method  D.  Any  Soil  Liner  Fill  not  meeting  the  permeability  <br />specification shall be removed and replaced with material meeting the permeability  <br />specification, at no additional cost to CC&V.  <br />3. CONTRACTOR shall place and compact the Soil Liner Fill in loose lifts such that the  <br />compacted lift thickness is a minimum of 12‐inches.  <br />4. CONTRACTOR shall  compact  the  Soil  Liner  Fill  to  at  least  95  percent  of  the  <br />maximum dry density as determined by the Standard Proctor density test (ASTM  <br />D698).  The moisture content shall be within +3% to ‐2% of the optimum moisture  <br />content. Both moisture and density shall be uniform throughout the lift. If the Soil  <br />Liner Fill cannot be conditioned to meet the placement specifications, the material  <br />shall  be  removed  and  replaced  with  new  Soil  Liner  Fill  at  the CONTRACTOR's  <br />expense.  The CONTRACTOR shall reduce the clod size of the soil liner fill to a size  <br />that  is  acceptable  to  the CERTIFYING  ENGINEER,  the  method  by  which  will  be  <br />approved by CERTIFYING ENGINEER and MANAGER prior to implementation.  <br />5. The moisture content of the Soil Liner Fill shall be uniform throughout prior to and  <br />during compaction of the material. CONTRACTOR shall be responsible for meeting  <br />moisture content and compaction SPECIFICATIONS. If the Soil Liner Fill cannot be  <br />conditioned to meet the placement SPECIFICATIONS, the material shall be removed  <br />and replaced with new Soil Liner Fill at no additional cost to CC&V. MANAGER may  <br />require CONTRACTOR to moisture condition Soil Liner Fill at stockpile at least 24  <br />hours prior to the Soil Liner Fill being placed.  <br />6. CONTRACTOR shall place Soil Liner Fill to form a continuous monolithic material. If  <br />a  lift  of  compacted  Soil  Liner  Fill  dries  out  during  placement operations,  <br />CONTRACTOR shall scarify, moisture condition the dry soil and recompact the lift. If  <br />a lift of compacted Soil Liner Fill becomes overly wet due to precipitation or over  <br />watering, CONTRACTOR shall allow the wet soil to dry to the specified moisture  <br />content range before recompaction of fill and placement of geosynthetic materials.  <br />7. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing.  <br />Soil Liner Fill sampling shall be scheduled by CQA Monitor with CONTRACTOR to  <br />facilitate CQA field testing.  <br />8. CONTRACTOR shall  maintain  Soil  Liner  Fill  stockpile  areas  in  a  free‐draining  <br />condition. The CONTRACTOR will maintain Soil Liner Fill stockpiles and Soil Liner Fill  <br />placed within the limits of the valley leach facility to prevent the drying out of the  <br />surface.