Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 14  <br />minimum  of  120  inches  for  CAT  777  (or  equivalent)  of  Low  Volume Solution  <br />Collection Fill placed over the geomembrane and solution collection piping.  <br />7. When placing Low Volume Solution Collection Fill the maximum acceptable drop  <br />height is 3 feet.  <br />8. CONTRACTOR shall operate equipment in a manner that is protective of underlying  <br />geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the occurrence of  <br />any damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR  <br />to  remove  Low  Volume  Solution  Collection  Fill  to  expose  the  geosynthetics.  <br />CONTRACTOR shall  uncover,  repair  any  observed  damage  of  the  underlying  <br />geosynthetics, in accordance with the repair requirements of Sections 02776.0 and  <br />02777.0 of these SPECIFICATIONS, and recover, at no cost to CC&V.  <br />9. CONTRACTOR shall place Low Volume Solution Collection Fill at a rate such that no  <br />single area of 350,000 square feet of geomembrane liner is exposed to ultraviolet  <br />light for more than 180 days.  <br />10. CONTRACTOR shall provide close continuous monitoring at the point of placement  <br />during the placement of the Low Volume Solution Collection Fill over geosynthetics.  <br />11. CONTRACTOR shall verify the final thickness of Low Volume Solution Collection Fill  <br />to  determine  compliance  with  this  SPECIFICATION. CONTRACTOR shall  record  <br />verification  location,  elevation,  and  thickness.  CQA  Monitor  shall  witness  all  <br />verification measurements. CONTRACTOR will submit a method of verifying Low  <br />Volume Solution Collection Fill depth to MANAGER for approval. Grade markers  <br />shall be placed on a 50‐ by‐50‐foot grid with additional points required for breaks in  <br />grade. CONTRACTOR shall  remove  all  grade  markers  under  supervision  of  CQA  <br />Monitor after  verification measurements have been approved by MANAGER and  <br />CERTIFYING ENGINEER and  will backfill holes with Low Volume Solution Collection  <br />Fill.  Areas  with  deficient  thickness  shall  be  reworked  by CONTRACTOR,  until  <br />acceptable measurements  are  obtained.  If MANAGER or CERTIFYING  ENGINEER  <br />suspects the occurrence of any damage to the underlying geosynthetics, MANAGER  <br />will instruct CONTRACTOR to remove Low Volume Solution Collection Fill to expose  <br />the geosynthetics. CONTRACTOR shall uncover, repair any observed damage of the  <br />underlying geosynthetics, in accordance with the repair requirements of Sections  <br />02776.0 and 02777.0 of these SPECIFICATIONS and recover, at no cost to CC&V.  <br />12. CONTRACTOR will provide adequate illumination as approved by MANAGER, if Low  <br />Volume Solution Collection Fill placement is carried out at night. A minimum of 2‐ <br />foot candles measured at the synthetic liner, shall be used when  Low  Volume  <br />Solution Collection Fill placement is carried out at night.  <br />G. Soil Liner Fill  <br />1. Soil Liner Fill shall be placed within the limits of the valley leach facility as shown on  <br />the  DRAWINGS  and  shall  begin  only  after  completion  of  all,  or MANAGER and