My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-31_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-08-31_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 3:51:10 PM
Creation date
10/25/2016 1:35:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/31/2016
Doc Name
Specifications - Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR78
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02200.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />June 15, 2016 <br /> <br /> <br /> <br />Page 14 <br />minimum of 120 inches for CAT 777 (or equivalent) of Low Volume Solution <br />Collection Fill placed over the geomembrane and solution collection piping. <br />7. When placing Low Volume Solution Collection Fill the maximum acceptable drop <br />height is 3 feet. <br />8. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br />geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the occurrence of <br />any damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR <br />to remove Low Volume Solution Collection Fill to expose the geosynthetics. <br />CONTRACTOR shall uncover, repair any observed damage of the underlying <br />geosynthetics, in accordance with the repair requirements of Sections 02776.0 and <br />02777.0 of these SPECIFICATIONS, and recover, at no cost to CC&V. <br />9. CONTRACTOR shall place Low Volume Solution Collection Fill at a rate such that no <br />single area of 350,000 square feet of geomembrane liner is exposed to ultraviolet <br />light for more than 180 days. <br />10. CONTRACTOR shall provide close continuous monitoring at the point of placement <br />during the placement of the Low Volume Solution Collection Fill over geosynthetics. <br />11. CONTRACTOR shall verify the final thickness of Low Volume Solution Collection Fill <br />to determine compliance with this SPECIFICATION. CONTRACTOR shall record <br />verification location, elevation, and thickness. CQA Monitor shall witness all <br />verification measurements. CONTRACTOR will submit a method of verifying Low <br />Volume Solution Collection Fill depth to MANAGER for approval. Grade markers <br />shall be placed on a 50‐ by‐50‐foot grid with additional points required for breaks in <br />grade. CONTRACTOR shall remove all grade markers under supervision of CQA <br />Monitor after verification measurements have been approved by MANAGER and <br />CERTIFYING ENGINEER and will backfill holes with Low Volume Solution Collection <br />Fill. Areas with deficient thickness shall be reworked by CONTRACTOR, until <br />acceptable measurements are obtained. If MANAGER or CERTIFYING ENGINEER <br />suspects the occurrence of any damage to the underlying geosynthetics, MANAGER <br />will instruct CONTRACTOR to remove Low Volume Solution Collection Fill to expose <br />the geosynthetics. CONTRACTOR shall uncover, repair any observed damage of the <br />underlying geosynthetics, in accordance with the repair requirements of Sections <br />02776.0 and 02777.0 of these SPECIFICATIONS and recover, at no cost to CC&V. <br />12. CONTRACTOR will provide adequate illumination as approved by MANAGER, if Low <br />Volume Solution Collection Fill placement is carried out at night. A minimum of 2‐ <br />foot candles measured at the synthetic liner, shall be used when Low Volume <br />Solution Collection Fill placement is carried out at night. <br />G. Soil Liner Fill <br />1. Soil Liner Fill shall be placed within the limits of the valley leach facility as shown on <br />the DRAWINGS and shall begin only after completion of all, or MANAGER and
The URL can be used to link to this page
Your browser does not support the video tag.