Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 13  <br />2. CONTRACTOR shall condition Leak Detection Fill to allow a surface that does not  <br />cause rutting or other deleterious effects.  <br />F. Low Volume Solution Collection Fill  <br />1. Low Volume Solution Collection Fill shall be placed over the geomembrane in the  <br />locations shown on the DRAWINGS.  <br />2. CONTRACTOR shall condition Low Volume Solution Collection Fill to allow a surface  <br />that does not cause rutting or other deleterious effects.  <br />3. CONTRACTOR shall  place  Low  Volume  Solution  Collection  Fill  around  the  Low  <br />Volume Solution Collection Vertical Riser Pipes in maximum 12‐inch loose lifts and  <br />compact using a hand operated vibratory plate compactor to the satisfaction of the  <br />MANAGER and CERTIFYING ENGINEER. Low Volume Solution Collection Fill shall be  <br />worked under the Low Volume Solution Collection Rise pipe haunches by hand to  <br />provide uniform support of the pipe.  <br />4. Prior to placing the Low Volume Solution Collection Fill, CONTRACTOR shall verify  <br />by  visual  inspection  that  the  underlying  geosynthetics  are  free of holes, tears,  <br />wrinkles, or foreign objects. MANAGER and CERTIFYING ENGINEER will inspect the  <br />geosynthetic for wrinkles prior to placement of Low Volume Solution Collection Fill.  <br />As  instructed  by MANAGER, CONTRACTOR shall  "work  out"  wrinkles  to  the  <br />satisfaction of MANAGER and CERTIFYING ENGINEER prior to placement of the Low  <br />Volume Solution Collection Fill. In all cases, wrinkles shall not be of a size that they  <br />could fold back on themselves. Wrinkles greater than one foot shall be removed  <br />and repaired by the INSTALLER.  <br />5. CONTRACTOR shall place Low Volume Solution Collection Fill in a single 36‐inch  <br />loose lift. The tracked equipment shall operate only over previously placed Low  <br />Volume Solution Collection Fill. CONTRACTOR shall not operate equipment directly  <br />on geosynthetics. Only a dozer with a ground pressure not exceeding 14.7 psi can  <br />be  used  to  place  Low  Volume  Solution  Collection  Fill.  Equipment used for  <br />placement will not be allowed to pivot on one track (i.e., no abrupt or sharp turns).  <br />There shall be no downhill placement on slopes steeper than 4H:1V. Material can  <br />be placed along contours if buttressed from below.  <br />6. Rubber  tired  construction  equipment  shall  not  be  allowed  to  travel  over  the  <br />geomembrane or on top of Solution Collection piping unless a thickness of at least  <br />45  inches  of  Low  Volume  Solution  Collection  Fill  has  been  placed  over  the  <br />geomembrane and on top of Solution Collection piping. The CONTRACTOR will be  <br />required to demonstrate to the MANAGER, DESIGN ENGINEER and CERTIFYING  <br />ENGINEER  that the equipment and procedures used are not detrimental to the  <br />geomembrane  and  piping,  at  no  cost  to CC&V.  Off  road  haul  truck  traffic  shall  <br />require a minimum of 60 inches for Cat 773 (or equivalent) of Low Volume Solution  <br />Collection Fill placed over the geomembrane and solution collection piping, and a