Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 12  <br />C. Select Structural Fill  <br />1. Select Structural Fill shall be placed for miscellaneous site grading as required by  <br />the MANAGER and CERTIFYING ENGINEER.  <br />2. CONTRACTOR shall condition Select Structural Fill to a moisture content that allows  <br />compaction to the required density and that results in a firm, unyielding surface  <br />capable  of  allowing  the  movement  of  vehicles  and  equipment  over the  surface  <br />without causing rutting or other deleterious effects.  <br />3. CONTRACTOR shall place Select Structural Fill materials with less than 30 percent  <br />rock materials above 3/4‐inch size in maximum 12‐inch loose lifts, and compacted  <br />to 95 percent of maximum dry density (ASTM D698).  <br />4. CONTRACTOR shall condition and place Select Structural Fill containing more than  <br />30 percent rock materials above 3/4‐inch size (rock fill) in maximum 12‐inch loose  <br />lifts and compact by a method compaction technique. The compaction equipment  <br />shall consist of a minimum ten 10‐ton (static drum weight) vibratory smooth‐drum  <br />compactor.  The  number  of  passes  shall  be  subject  to CERTIFYING  ENGINEER's  <br />approval,  at  no  additional  cost  to CC&V.  The  method  SPECIFICATIONS  may  be  <br />changed at any time, at the discretion of CERTIFYING  ENGINEER,  based  upon  <br />changes in material characteristics, field conditions, and/or compaction equipment.  <br />D. Underdrain Fill  <br />1. Underdrain Fill shall be placed in the Underdrains as shown in the DRAWINGS.  <br />2. CONTRACTOR shall  condition  Underdrain  Fill  that  results  in  a  firm,  unyielding  <br />surface  capable  of  allowing  the  movement  of  vehicles  and  equipment  over  the  <br />surface without causing rutting or other deleterious effects.  <br />3. CONTRACTOR shall  condition,  place  and  compact  Underdrain  Fill  by  a  method  <br />compaction technique. The compaction equipment shall consist of a minimum 10‐ <br />ton (static drum weight) vibratory smooth‐drum compactor. The number of passes  <br />and loose lift thickness shall be subject to CERTIFYING ENGINEER's approval, at no  <br />additional cost to CC&V. The method SPECIFICATIONS may be changed at any time,  <br />at the discretion of MANAGER, based upon changes in material characteristics, field  <br />conditions, and/or compaction equipment.  <br />4. Provisions shall be made by CONTRACTOR for removal of oversize materials from  <br />fills, at no additional cost to CC&V.  <br />5. The MANAGER will minimize the amount of traffic over the Underdrain Fill.  <br />E. Leak Detection Fill  <br />1. Leak Detection Fill shall be placed in the Leak Detection Trenches as shown on the  <br />DRAWINGS.