My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-31_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-08-31_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 3:51:10 PM
Creation date
10/25/2016 1:35:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/31/2016
Doc Name
Specifications - Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR78
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02200.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />June 15, 2016 <br /> <br /> <br /> <br />Page 12 <br />C. Select Structural Fill <br />1. Select Structural Fill shall be placed for miscellaneous site grading as required by <br />the MANAGER and CERTIFYING ENGINEER. <br />2. CONTRACTOR shall condition Select Structural Fill to a moisture content that allows <br />compaction to the required density and that results in a firm, unyielding surface <br />capable of allowing the movement of vehicles and equipment over the surface <br />without causing rutting or other deleterious effects. <br />3. CONTRACTOR shall place Select Structural Fill materials with less than 30 percent <br />rock materials above 3/4‐inch size in maximum 12‐inch loose lifts, and compacted <br />to 95 percent of maximum dry density (ASTM D698). <br />4. CONTRACTOR shall condition and place Select Structural Fill containing more than <br />30 percent rock materials above 3/4‐inch size (rock fill) in maximum 12‐inch loose <br />lifts and compact by a method compaction technique. The compaction equipment <br />shall consist of a minimum ten 10‐ton (static drum weight) vibratory smooth‐drum <br />compactor. The number of passes shall be subject to CERTIFYING ENGINEER's <br />approval, at no additional cost to CC&V. The method SPECIFICATIONS may be <br />changed at any time, at the discretion of CERTIFYING ENGINEER, based upon <br />changes in material characteristics, field conditions, and/or compaction equipment. <br />D. Underdrain Fill <br />1. Underdrain Fill shall be placed in the Underdrains as shown in the DRAWINGS. <br />2. CONTRACTOR shall condition Underdrain Fill that results in a firm, unyielding <br />surface capable of allowing the movement of vehicles and equipment over the <br />surface without causing rutting or other deleterious effects. <br />3. CONTRACTOR shall condition, place and compact Underdrain Fill by a method <br />compaction technique. The compaction equipment shall consist of a minimum 10‐ <br />ton (static drum weight) vibratory smooth‐drum compactor. The number of passes <br />and loose lift thickness shall be subject to CERTIFYING ENGINEER's approval, at no <br />additional cost to CC&V. The method SPECIFICATIONS may be changed at any time, <br />at the discretion of MANAGER, based upon changes in material characteristics, field <br />conditions, and/or compaction equipment. <br />4. Provisions shall be made by CONTRACTOR for removal of oversize materials from <br />fills, at no additional cost to CC&V. <br />5. The MANAGER will minimize the amount of traffic over the Underdrain Fill. <br />E. Leak Detection Fill <br />1. Leak Detection Fill shall be placed in the Leak Detection Trenches as shown on the <br />DRAWINGS.
The URL can be used to link to this page
Your browser does not support the video tag.