Laserfiche WebLink
October 13, 2016 C-2009-087/Peabody Sage Creek Mine JLE <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 5 of 9 <br /> <br />The mine is currently idle and not activity is occurring at the site. The coal from the two coal storage stockpiles <br />have been hauled to the Foidel Creek Mine for processing and are no longer at the site. <br /> <br /> <br />Figure 4. Portal Area <br /> <br /> <br />OTHER (SPECIFY): <br />The following maintenance items were observed during previous Division inspections. Each item is listed below <br />along with an update on the status of the item: <br /> Please repair the trash rack at the inlet to the approved primary spillway at Pond 004. <br />o This item was addressed. <br /> Please submit a Minor Revision to update Map 2.04.7 -M1 to depict the location of the new stock-tank <br />installed above Pond 004 in accordance with Rule 2.010.3(1)(e). <br />o This item is outstanding. <br /> Clean out the upper reaches of ditches FA-D5 and FA-D6. <br />o PSCM is exploring ripping out the smart ditch liners and armoring the ditches with rip-rap instead. <br />According to Mr. Watterson they are waiting for an estimate from their contractors for this <br />activity. Any change in the ditch design will need to be submitted to and approved by the <br />Division prior to implementation. The sediment buildup in these ditches have not been cleaned <br />nor do they appear to have gotten worse. PSCM must clean out these ditches regardless of the <br />possible future plans to redesign these ditches. <br /> Repair the section of the FA-D6 ditch that has buckled. <br />o This item remains outstanding.