Laserfiche WebLink
October 12, 2016 C-1982-056/Foidel Creek Mine JLE <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 8 of 14 <br /> <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br />The 10RT Borehole area was observed. The culvert located at the access road is partially crushed, The borehole <br />pad area is stable no problems were observed. <br /> <br />The 10RT borehole pipeline has been installed. T he connection area on the east side consists of two manholes in- <br />place and the area has been back filled and roughened. The site will be seeded in the near future. TC should <br />install sediment control waddles at the base of the construction area to limit off -site sedimentation. Also <br />disturbance boundary markers need to be placed around the new pipeline installation disturbance. There are <br />several old markers in-place but their number and spacing frequency are not adequate. <br /> Please install sediment control waddles around the base of the two pipeline connection locations at the east <br />and west end of the 10RT pipeline. <br /> Please place disturbance boundary markers around the new 10RT pipeline installation disturbance. <br /> <br />The 13 Left Outby Gate Road Utility Borehole area was obse rved, no activity was occurring at the borehole. The <br />disturbance boundary markers have been knocked over by cattle around the pad area the topsoil piles are stable, <br />vegetated and marked with an identification markers. The access road is stable. A culvert is installed at the bend <br />in the access road and TC will need to clean out the outlet of this culvert. <br /> <br />The Northwest ventilation shaft area was observed and no problems were noted. <br /> <br />The 6MN ventilation shaft area is stable and no problems were observed. The topsoil piles were stable and <br />vegetated. <br /> <br />The 5MN cement borehole pad area is stable. The drainage and sediment control features are functional. <br /> <br />The 5MN Pipeline area was observed between the 6MN access road and the 5MN Pad area. Near the center of the <br />pipeline corridor , the ground surface has slumped to a small degree and this area has sparse vegetation established. <br />TC may want to consider inter seeding this area.