Laserfiche WebLink
October 12, 2016 C-1982-056/Foidel Creek Mine JLE <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 9 of 14 <br /> <br /> <br />Figure 5. 5MN Pipeline Corridor <br /> <br />The Fish Creek Tipple reclaimed area is overall vegetated and stable. TC has pla ced additional erosion control <br />waddles on the steep slope above the sediment pond. <br /> <br />The 9-East Utility Borehole area was observed. The boreholes are completed and it appears the blower unit and <br />electrical distribution system has been installed. A contrac tor is on site mixing concrete in a portable mixing <br />station. The surrounding sediment control ditches were clear and functional. The topsoil stockpiles are marked <br />with identification markers and appear stable. <br /> <br /> <br />Figure 6. 9 East Utility Boreholes/Ele ctrical Station and Blower Units.