My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-20_REVISION - C1981035 (17)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2016-10-20_REVISION - C1981035 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 10:57:25 AM
Creation date
10/24/2016 10:06:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
10/20/2016
Doc Name
Adequacy Review Response
From
GCC Energy, LLC
To
DRMS
Type & Sequence
TR26
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />King Coal Mine (C-1981-035) TR-26 Adequacy Review #2 Response <br /> <br /> Text from your August 31, 2016 document is reprinted below. The following adequacy <br />items are numbered to correspond to the initial items from the Division’s first adequacy <br />letter dated November 25, 2015. A large portions of the text from the first adequacy letter <br />and from the GCCE response are not repeated here. This was intentionally done to focus <br />attention on the required tasks moving forward. Responses by GCC Energy are shown in <br />underlined italics. <br /> <br /> <br />1. DRMS August 31, 2016: No further response required. <br /> <br />2. DRMS August 31, 2016: No further response required. <br /> <br />3. DRMS August 31, 2016: Other than submission of the “Natural Resources Survey”, no further <br />response required. <br /> <br />GCCE October 18, 2016: The “Natural Resources Survey” for the monitoring well sites will be attached as <br />Appendix 8(6) when received by GCC Energy. The field work for this study was recently completed by Ecosphere <br />Environmental Services and a final report is expected within approximately two weeks from today. No drilling or <br />surface disturbance will take place prior to submittal of this report and its acceptance by the Division. <br /> <br />4. DRMS August 31, 2016: No further response required. <br /> <br />5. DRMS August 31, 2016: No further response required. <br /> <br />6. DRMS August 31, 2016: The Division approves the proposed locations of additional monitoring <br />points. The list of analytes proposed by GCCE (tables in proposed Section 2.05.6) is sufficient. No <br />further response required. <br /> <br />7. DRMS August 31, 2016: No further response required. <br /> <br />8. DRMS August 31, 2016: Additional information in the PAP is needed regarding management <br />practices (BMPs) for erosion and sediment control for the drill pads. This should be discussed in <br />the PAP text and a note added to the design (Appendix 4(4)) stating that wattles or other BMPs <br />will be field fit. (The new location of Cluster MW-4 appears to make this issue more important <br />than prior to the change in location.) <br /> <br />GCCE October 18, 2016: Section 2.04.6 of the PAP text has been revised to include best management practices <br />(BMPs) for erosion and sediment control for the drill pads. Also, a note has been added to the design (Appendix <br />4(4) stating that wattles or other BMPs will be field fit. <br /> <br />9. DRMS August 31, 2016: No further response required. <br /> <br />10. DRMS August 31, 2016: No further response required. <br /> <br />11. DRMS August 31, 2016: No further response required. <br /> <br />12. DRMS August 31, 2016: No further response required. <br /> <br />13. DRMS August 31, 2016: Please submit the agreement information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.