Laserfiche WebLink
Borehole Worksheet Cont'd Task # TTT <br />MISCELLANEOUS TRUCK WORK <br />Task description: Water truck for dust control <br />Site: Kine Coal Mine <br />Permit Action: Midterm Review <br />No. 7 <br />PROJECT IDENTIFICATION <br />Task #: 314 <br />Date: 2/11/2015 <br />User: SLB <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Make and Model: Water Tanker, 2,500 Gal. <br />Attachment 1: <br />Attachment 2: <br />Labor Unit 1: Tanker Driver - 1 rear axle <br />Labor Unit 2: <br />Cost Breakdown: <br />Permit/Job#: C1981035 <br />JOB TIME AND COST <br />Fleet size: 1 Truck(s) Total job time: <br />Unit cost: $57.56 /Hour <br />Page 103 of 123 <br />Abbreviation: None <br />Filename: C035-314 <br />Horsepower: 150 <br />Shift Basis: 1 per day <br />Weight: 5.25 <br />(US Tons) <br />240.00 Hours <br />Total job cost: $13,814 <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$7.43 NA <br />Operating Cost/Hour: <br />$22.24 100 <br />Operator Cost/Hour: <br />$27.88 NA <br />Total Unit Cost/Hour: <br />$57.56 <br />Total Fleet Cost/Hour: <br />$57.56 <br />JOB TIME AND COST <br />Fleet size: 1 Truck(s) Total job time: <br />Unit cost: $57.56 /Hour <br />Page 103 of 123 <br />Abbreviation: None <br />Filename: C035-314 <br />Horsepower: 150 <br />Shift Basis: 1 per day <br />Weight: 5.25 <br />(US Tons) <br />240.00 Hours <br />Total job cost: $13,814 <br />CIRCES Cost Estimating Software <br />