Laserfiche WebLink
Borehole Worksheet Cont'd Task # TTT Page 104 of 123 <br />TRUCK/LOADER TEAM WORK <br />Task description: King II - distribute tosoil from Cochrane stockpile <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 401 State: Colorado <br />Date: 2/11/2015 County: La Plata <br />User: SLB <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Truck Loader Team -Truck: Generic 12-18 c , 6x4 <br />-Loader: CAT 938H <br />Support Equipment -Load Area: NA <br />-Dump Area: CAT 938H <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C035-401 <br />Shift basis: 1 per day <br />Cnct Rreakdnwn- Tnick/I.naAer Team Cimnnrt P-,;__ ­t T.4.„t----..o <br />Total work team cost/hour: $410.72 <br />MATERIAL QUANTITIES <br />Initial volume: 27,699 CCY <br />Loose volume: 33,654 LCY <br />Source of estimated volume: 22.36 ac - 1.5 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.215 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 1,600 Pounds/LCY <br />Description: Top Soil <br />Rated Payload: 50,300 Pounds <br />Payload Capacity: 31.44 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$15.21 <br />$21.63 <br />NA <br />$21.63 <br />NA <br />NA <br />Operating cost/hour: <br />$66.59 <br />$38.09 <br />NA <br />$38.09 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$26.72 <br />$37.13 <br />NA <br />$37.13 <br />NA <br />NA <br />Unit Subtotals: <br />$108.51 <br />$96.85 <br />NA <br />$96.85 <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$313.87 <br />Support: <br />$96.85 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $410.72 <br />MATERIAL QUANTITIES <br />Initial volume: 27,699 CCY <br />Loose volume: 33,654 LCY <br />Source of estimated volume: 22.36 ac - 1.5 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.215 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 1,600 Pounds/LCY <br />Description: Top Soil <br />Rated Payload: 50,300 Pounds <br />Payload Capacity: 31.44 LCY <br />CIRCES Cost Estimating Software <br />