Laserfiche WebLink
Borehole Worksheet Cont'd <br />Task # TTT <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.793 <br />Blade type: <br />1.000 <br />Net correction: 0.3949 <br />Adjusted unit production: 552.86 LCY/hr <br />Adjusted fleet production: 552.86 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.389/LCY <br />Total job time: 13.20 Hours <br />Total job cost: $2,841 <br />1 SMFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 102 of 123 <br />CIRCES Cost Estimating Software <br />