My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_PERMIT FILE - M2016010 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016010
>
_PERMIT FILE - M2016010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2020 4:05:29 PM
Creation date
9/30/2016 12:17:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016010
IBM Index Class Name
Permit File
Doc Name
Adequacy Review Response #3
From
Transit Mix Concrete Co.
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hitch Rack Ranch Phase III Surety Calculation Details <br /> Crew No. Bare Costs Incl. Subs O&P Cost Per Labor-Hour <br /> Crew B34S (Open) Hr. Daily Hr. Daily Bare Costs Incl. O&P <br /> 2 Pipe Fitters $44.95 $719.20 $74.10 $1,185.60 $41.08 $67.78 <br /> 1 Truck Driver(heavy) $34.15 $273.20 $56.35 $450.80 <br /> 1 Equip. Oper. (crane) $40.25 $322.00 $66.55 $532.40 <br /> 1 Flatbed Trailer, 40 Ton $154.60 $170.05 <br /> 1 Truck Tractor, 6x4, 380 F.P. $600.00 $660.00 <br /> 1 Hyd. Crane, 80 Ton $1,630.00 $1,793.00 <br /> 1 Hyd. Excavator, 2 C.Y. $1,176.00 $1,293.60 $111.27 $122.40 <br /> 32 L.H., Daily Totals $4,875.001 1 $6,085.45 $152341 $190.17 <br /> Crew No. Bare Costs Incl. Subs O&P Cost Per Labor-Hour <br /> Crew B38 (Open) Hr. Daily Hr. Daily Bare Costs Incl. O&P <br /> 2 Laborers $29.20 $467.20 $48.90 $782.40 $32.08 $53.45 <br /> 1 Equip. Oper. (light) $37.85 $302.80 $62.55 $500.40 <br /> 1 Backhoe Loader, 48 H.P. $365.40 $401.95 <br /> 1 Hyd. Hammer, (1200 lb.) $179.60 $197.55 $22.71 $24.98 <br /> 24 L.H., Daily Totals 1 $1,315.001 1 il,882.30.1 $54.79 $78.43 <br /> Crew No. Bare Costs Incl. Subs O&P Cost Per Latbor-Hour <br /> Crew R3(Open) Hr. Daily Hr. Daily Bare Costs Incl. O&P <br /> 1 Electrician Foreman $44.55 $356.40 $72.87 $582.94 $43.49 $71.28 <br /> 1 Electrician $44.05 $352.40 $72.05 $576.40 <br /> .500 Equip. Oper. (crane) $40.25 $161.00 $66.55 $266.20 <br /> 1.500 S.P. Crane, 4x4, 5 Ton 1 $140.401 1 $154.45 $7.02 $7.72 <br /> 20 L.H., Daily Totals $1,010.201 1 $1,579.991 $50.51 $79.00 <br /> Printed 9/26/2016 APPENDIX L-1 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.