My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_PERMIT FILE - M2016010 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016010
>
_PERMIT FILE - M2016010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2020 4:05:29 PM
Creation date
9/30/2016 12:17:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016010
IBM Index Class Name
Permit File
Doc Name
Adequacy Review Response #3
From
Transit Mix Concrete Co.
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hitch Rack Ranch Phase III Surety Calculation Details <br /> Crew No. Bare Costs Incl. Subs O&P Cost Per Labor-Hour <br /> Crew B13 (Open) Hr. Daily Hr. Daily Bare Costs Incl. O&P <br /> 1 Labor Foreman (outside) $31.20 $249.60 $52.25 $417.99 $31.38 $52.40 <br /> 4 Laborers $29.20 $934.40 $48.90 $1,564.80 <br /> 1 Equip. Oper. (crane) $40.25 $322.00 $66.55 $532.40 <br /> 1 Hyd. Crane, 25 Ton $748.801 1 $823.70 $15.601 $17.16 <br /> 48 L.H., Daily Totals 1 $2,254.801 1 $3,338.89 $46.98 $69.56 <br /> Crew No. Bare Costs Incl. Subs O&P Cost Per Labor-Hour <br /> Crew B13B(Open) Hr. Daily Hr. Daily Bare Costs Incl. O&P <br /> 1 Labor Foreman(outside) $31.20 $249.60 $52.25 $417.99 $31.96 $53.29 <br /> 4 Laborers $29.20 $934.40 $48.90 $1,564.80 <br /> 1 Equip. Oper. (crane) $40.25 $322.00 $66.55 $532.40 <br /> 1 Equip. Oper. (oiler) $35.45 $283.60 $58.60 $468.80 <br /> 1 Hyd. Crane, 55 Ton $1,123.00 $1,235.30 $20.051 $22.06 <br /> 56 L.H., Daily Totals $2,912.60 $4,219.29 $52011 $75.34 <br /> Crew No. Bare Costs 7 Incl. Subs O&P Cost Per Labor-Hour <br /> Crew B13L (Open) Hr. Daily Hr. Daily Bare Costs Incl. O&P <br /> 2 Equip. Opers. (crane) $40.25 $644.00 $66.55 $1,064.80 $40.25 $66.55 <br /> 1 Hyd. Excavator, 1.5 C.Y. $1,029.00 $1,131.90 <br /> 1 Hyd. Hammer, 5000 ft-lb $367.80 $404.60 <br /> 1 Hyd. Excavator, .75 C.Y $654.00 $719.40 $128.18 $140.99 <br /> 16 L.H., Daily Totals 1 $2,694.80 1 $3,320.701 $168.43 $207.54 <br /> Crew No. Bare Costs Incl. Subs O&P Cost Per Labor-Hour <br /> Crew B34B(Open) Hr. Daily Hr. Daily Bare Costs Incl. O&P <br /> 1 Truck Driver(heavy) $34.15 $273.20 $56.35 $450.80 $34.15 $56.35 <br /> 1 Dump Truck, 12 C.Y., 402 H.P. $690.80 $759.90 $86.35 $94.99 <br /> 8 L.H., Daily Totals $964.001 $1,210.701 $120.50 $151.34 <br /> Crew No. Bare Costs Incl. Subs O&P Cost Per Laibor-Hour <br /> Crew B34P (Open) Hr. Daily Hr. Daily Bare Costs Incl. O&P <br /> 1 Pipe Fitter $44.95 $359.60 $74.10 $592.80 $39.13 $64.58 <br /> 1 Truck Driver(light) $33.10 $264.80 $54.60 $436.80 <br /> 1 Equip. Oper. (medium) $39.35 $314.80 $65.05 $520.40 <br /> 1 Flatbed Truck, Gas, 3 To $307.40 $338.15 <br /> 1 Backhoe Loader, 48 H.P. $365.40 $401.95 $28.031 $30.84 <br /> 24 L.H., Daily Totals $1,612.00 $2,290.10 $67.171 $95.42 <br /> Printed 9/26/2016 APPENDIX L-1 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.