Laserfiche WebLink
Hitch Rack Ranch Phase III Surety Calculation Details <br /> Project: Hitch Rack Ranch <br /> Date: 07/05/16 <br /> Prepared by: Norwest Corporation <br /> DEMOLITION CREWS AND EQUIPMENT <br /> Crew No. Bare Costs Incl. Subs O&P Cost Per Labor-Hour <br /> Crew B6(Open) Hr. Daily Hr. Daily Bare Costs Incl. O&P <br /> 2 Laborers $29.20 $467.20 $48.90 $782.40 $32.08 $53.45 <br /> 1 Equip. Oper. (light) $37.85 $302.80 $62.55 $500.40 <br /> 1 Backhoe Loader, 48 H.P. $365.40 $401.95 $15.23 $16.75 <br /> 24 L.H., Daily Totals 1 $1,135.401 $1,684.75 $47.311 $70.20 <br /> Crew No. 7 Bare Costs Incl. Subs O&P Cost Per Labor-Hour <br /> Crew B8(Open) Hr. Daily Hr. Daily Bare Costs Incl. O&P <br /> 1 Labor Foreman(outside) $31.20 $249.60 $52.25 $417.99 $33.80 $56.12 <br /> 2 Laborers $29.20 $467.20 $48.90 $782.40 <br /> 2 Equip. Oper. (medium) $39.35 $629.60 $65.05 $1,040.80 <br /> 2 Truck Drivers(heavy) $34.15 $546.40 $56.35 $901.60 <br /> 1 Hyd. Crane, 25 Ton $748.80 $823.70 <br /> 1 Crawler Loader, 3 C.Y. $1,197.00 $1,316.70 <br /> 2 Dump Trucks, 12 C.Y., 400 H.P. $1,381.601 1 $1,519.75 $59.421 $65.36 <br /> 56 L.H., Daily Totals 1 $5,220.201 1 $6,802.94 $93.221 $121.48 <br /> Crew No. Bare Costs Incl. Subs O&P Cost Per Labor-Hour <br /> Crew B11A(Open) Hr. Daily Hr. Daily Bare Costs Incl. O&P <br /> 1 Equipment Oper. (med.) $39.35 $314.80 $65.05 $520.40 $34.28 $56.98 <br /> 1 Laborer $29.20 $233.60 $48.90 $391.20 <br /> 1 Dozer, 200 H.P. $1,397.00 $1,536.70 $87.31 $96.04 <br /> 16 L.H., Daily Totals $1,945.40 1 $2,448.30 $121.591 $153.02 <br /> Crew No. Bare Costs Incl. Sub's O&P Cost Per Labor-Hour <br /> Crew B12B(Open) Hr. Daily Hr. Daily Bare Costs Incl. O&P <br /> 1 Equip. Oper. (crane) $40.25 $322.00 $66.55 $532.40 $34.73 $57.73 <br /> 1 Laborer $29.20 $233.60 $48.90 $391.20 <br /> 1 Hyd. Excavator, 1.5 C.Y. $1,029.00 $1,131.90 $64.31 $70.74 <br /> 16 L.H., Daily Totals 1 $1,584.601 1 $2,055.501 $99.041 $128.47 <br /> Printed 9/26/2016 APPENDIX L-1 4 <br />