Hitch Rack Ranch Phase III Surety Calculation Details <br /> Cost <br /> EARTHWORK SUMMARY <br /> Hi hwall $25,395.04 <br /> Stockpiles $123,991.81 <br /> Pit Floors, Roads, and Facilities $218,052.56 <br /> Drainages and Ponds $334,874.09 <br /> Plant Growth Material $292,813.39 <br /> Subtotal $995,126.89 <br /> Total $995,127.00 <br /> Printed 9/26/2016 APPENDIX L-1 7 <br />