My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-27_REVISION - M2008082
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008082
>
2016-09-27_REVISION - M2008082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:10 PM
Creation date
9/27/2016 4:35:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Revision
Doc Date
9/27/2016
Doc Name
Request for Technical Revision
From
Ready Mixed Concrete Company (RMCC)
To
DRMS
Type & Sequence
TR3
Email Name
ECS
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Morton Lakes DRM&S Permit # M-2008-082 TR -003 <br />Overview of Morton Lakes Technical Revision (TR -003) <br />On March 26, 2009 the Colorado Division of Reclamation, Mining & <br />Safety (Division) approved Ready Mixed Concrete Company's (RMCC) <br />112c mining and reclamation permit for the Morton Lakes Pit (DRM&S <br />Permit # M-2008-082). The purpose of this Technical Revision (TR -003) is <br />to revise the sequence of Morton Lakes Mining Stages. <br />Recently, RMCC requested and was granted approval of TR -002 by <br />the DRMS. TR -002 changed the Morton Mining Stage 5 to Mining Stage 2 <br />and changed the original reclamation plan for Stage S (2) from a sealed pit to <br />wildlife habitat. Following excavation of Stage S (2) this stage is to be <br />backfilled with wash fines from the Morton sand and gravel processing <br />plant. Once filled with fines, the backfilled stage will be seeded with the <br />DBMS approved Wash Fines Basin Seed Mix. <br />As mining the new Stage 2 progressed this summer it became obvious <br />to RMCC that only the southerly 12 acres of the stage was mineable. The <br />remaining (northerly) 4 acres of Stage 2 is unminable due to multiple layers <br />of clay and mud throughout this part of the sand and gravel deposit. <br />Therefore, RMCC is seeking DRMS approval for TR -003 by which the <br />company will mine approximately eleven (11) of the 36 acres of Morton <br />Stage 3 (see attached map). The portion of Stage 3 to be mined is located at <br />the far south end of the Stage, immediately east of the sand and gravel <br />processing plant. Once mined out, this portion of Stage 3 will temporarily be <br />used to stockpile processed sand and gravel on the pit floor. The reclamation <br />of Stage 3 will remain unchanged, namely municipal water storage. <br />As previously approved by the Division, RMCC will use Stage 2 to <br />dispose of sand and gravel wash fines that otherwise would have been <br />pumped, over the South Platte River, to a disposal site on the east side of the <br />river. <br />September 21, 2016 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.