My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-27_REVISION - M2008082
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008082
>
2016-09-27_REVISION - M2008082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:10 PM
Creation date
9/27/2016 4:35:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Revision
Doc Date
9/27/2016
Doc Name
Request for Technical Revision
From
Ready Mixed Concrete Company (RMCC)
To
DRMS
Type & Sequence
TR3
Email Name
ECS
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
itil?4 <br />" COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />* 1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866-3567 <br />a76 <br />6►INTiT•7riT•ir7 <br />Morton Lak <br />272016 <br />File No.: M- Site Name: eS <br />Weld OMSION OF REC r N <br />countyWeld (1��Ise only <br />Permittee: Ready Mixed Concrete Company (RMCC) <br />&pl)ied! <br />Operator (If Other than Permittee): — <br />Permittee Representative: Joe Lamanna U Violations <br />Please provide a brief description of the proposed revision: <br />RMCC wishes to revise the current Morton Lakes mining sequence by mining an 11 we portion of Morton Stage 3 following mining of Stage 2. This mining sequence <br />change is necessitated by the fact that the north end of Stage 2 is not mineable due to day and mud sears in the sand and gravel deposit As a re" <br />RMCC will run out of minable sand and aravel at Morton before sand and amyel_froml-lolton will ready to be mined and conveyed to the Morton sand and aravel plant <br />The reclamation of Stage 2 will remain wildlife habitat Following mining of the initial 11 acre portion of Stage 3 (now identified as Stage 3-A) RMCC will use the pit floor of <br />stage 3-A to stockpile sand and gravel. However, the final redamatlon of Stage 3 will remain developed water storage <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />110c, 111, 112 construction ❑ <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 ❑ <br />110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.