My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-26_REVISION - C1981018 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2016-09-26_REVISION - C1981018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 8:37:30 AM
Creation date
9/27/2016 8:31:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
9/26/2016
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR169
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> <br />Task description: Backfilling Geotech Test Pits <br />Site: Deserado Mine Permit Action: MR 169 Permit/Job#: C1981018 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 9/21/2016 County: Moffat Filename: C018-001 <br />User: CCW <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8U <br />Horsepower: 305 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $52.86 NA <br />Operating Cost/Hour: $68.35 100 <br />Ripper own. <br />Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.89 NA <br />Total unit Cost/Hour: $160.10 <br />Total Fleet Cost/Hour: $160.10 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 8,296 <br />Swell factor: 1.000 <br />Loose volume: 8,296 LCY <br />Source of estimated volume: Map 160 <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly <br />production: <br />1,627.0 LCY/hr <br /> <br />Materials consistency description: Loose stockpile 1.2 <br /> <br />Average push <br />gradient: <br />0 % <br />Average site altitude: 5,650 feet <br /> <br />Material weight: 2,650 lbs/LCY <br /> <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source
The URL can be used to link to this page
Your browser does not support the video tag.