My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-26_REVISION - C1981018 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2016-09-26_REVISION - C1981018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 8:37:30 AM
Creation date
9/27/2016 8:31:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
9/26/2016
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR169
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> <br />Task description: Reclaim Geotech Investigation Area <br />Site: Deserado Mine Permit Action: MR 169 Permit/Job#: C1981018 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 9/26/2016 County: Moffat Filename: C018-000 <br />User: CCW <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Backfilling Geotech Test Pits DOZER 1 7.86 $1,259.00 <br />002 Reseed Geotech Test Area REVEGE 1 1.52 $575.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />9.38 <br /> <br />$1,834 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $37.05 <br />Performance bond: 1.05 Total = $19.26 <br />Job superintendent: 4.69 Total = $349.31 <br />Profit: 10.00 Total = $183.40 <br /> TOTAL O & P = $589.02 <br /> CONTRACT AMOUNT (direct + O & P) = $2,423.02 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 Total = $0.00 <br />Reclamation management and/or administration: 0.00 $0.00 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $589.02 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $2,423.02 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.