Laserfiche WebLink
Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.200 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 1.000 (DOZ-OC) <br />Push gradient: 1.000 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.868 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.6484 <br /> <br />Adjusted unit <br />production: 1,054.95 LCY/hr <br />Adjusted fleet <br />production: 1054.95 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.152/LCY <br /> <br />Total job time: 7.86 Hours <br />Total job cost: $1,259 <br /> <br />