My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-01_PERMIT FILE - C1981010A (15)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2016-08-01_PERMIT FILE - C1981010A (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 11:41:47 AM
Creation date
9/19/2016 9:38:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
8/1/2016
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Appendix A Reclamation Cost Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paoe No. 43 <br />Table A-13.4 Cont. <br />Borehole Description <br />t3orenole beaung vvorK <br />Sealinglttem <br />Method Diameter <br />Length <br />Quantity <br />Unit <br />Unit Cost <br />Total Costs <br />Portland cement <br />Coy <br />grout - 4 in. (labor, <br />4 <br />54 <br />54 <br />LF <br />$ <br />7.65 <br />$ <br />413.21 <br />equip, materials) <br />Portland cement <br />GD2 <br />grout - 4 in. (labor, <br />4 <br />210 <br />210 <br />LF <br />$ <br />7.65 <br />$ <br />1,606.94 <br />equip, materials) <br />Portland cement <br />GF4 <br />grout - 4 in. (labor, <br />4 <br />270 <br />270 <br />LF <br />$ <br />7.65 <br />$ <br />2,066.07 <br />equip, materials) <br />Portland cement <br />GF6 <br />grout - 4 in. (labor, <br />4 <br />200 <br />200 <br />LF <br />$ <br />7.65 <br />$ <br />1,530.42 <br />equip, materials) <br />Portland cement <br />GP2 <br />grout - 4 in. (labor, <br />4 <br />307 <br />307 <br />LF <br />$ <br />7.65 <br />$ <br />2,349.19 <br />equip, materials) <br />Portland cement <br />GP3 <br />grout- 4 in. (labor, <br />4 <br />154 <br />154 <br />LF <br />$ <br />7.65 <br />$ <br />1,178.42 <br />equip, materials) <br />Portland cement <br />GP4 <br />grout - 4 in. (labor, <br />4 <br />281 <br />281 <br />LF <br />$ <br />7.65 <br />$ <br />2,150.24 <br />equip, materials) <br />Portland cement <br />GP5 <br />grout - 4 in. (labor, <br />4 <br />284 <br />284 <br />LF <br />$ <br />7.65 <br />$ <br />2,173.20 <br />equip, materials) <br />GP7 <br />Portland cement <br />grout - 4 in. (labor, <br />4 <br />12 <br />12 <br />LF <br />$ <br />7.65 <br />$ <br />91.83 <br />equip, materials) <br />Portland cement <br />G138 <br />grout - 4 in. (labor, <br />4 <br />198 <br />198 <br />LF <br />$ <br />7.65 <br />$ <br />1,515.12 <br />equip, materials) <br />Portland cement <br />GP9 <br />grout -4in. (labor, <br />4 <br />202 <br />202 <br />LF <br />$ <br />7.65 <br />$ <br />1,545.72 <br />equip, materials) <br />Portland cement <br />11 <br />grout - 4 in. (labor, <br />4 <br />30 <br />30 <br />LF <br />$ <br />7.65 <br />$ <br />229.56 <br />equip, materials) <br />P1 <br />Portland cement <br />grout - 4 in. (labor, <br />4 <br />21 <br />21 <br />LF <br />$ <br />7.65 <br />$ <br />160.69 <br />equip, materials) <br />Portland cement <br />P2 <br />grout - 4 in. (labor, <br />4 <br />21 <br />21 <br />LF <br />$ <br />7.65 <br />$ <br />160.69 <br />equip, materials) <br />Portland cement <br />P3 <br />grout - 4 in. (labor, <br />4 <br />35 <br />35 <br />LF <br />$ <br />7.65 <br />$ <br />267.82 <br />equip, materials) <br />o--7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.