My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-01_PERMIT FILE - C1981010A (15)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2016-08-01_PERMIT FILE - C1981010A (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 11:41:47 AM
Creation date
9/19/2016 9:38:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
8/1/2016
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Appendix A Reclamation Cost Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page No. 42 <br />Table A-13.4 <br />Borehole Description <br />Borehole beaung vvorK <br />5ealinglltem <br />Method Diameter <br />Length <br />Quantit <br />Unit <br />Unit Cost <br />Total Costs <br />Portland cement <br />DW -23 <br />grout - 2 in. (labor, <br />2 <br />280 <br />280 <br />LF <br />$ <br />7.21 <br />$ <br />2,018.80 <br />equip, materials) <br />Portland cement <br />DW -24 <br />grout - 2 in. (labor, <br />2 <br />280 <br />280 <br />LF <br />$ <br />7.21 <br />$ <br />2,018.80 <br />equip, materials) <br />Portland cement <br />DW -26 <br />grout - 2 in. (labor, <br />2 <br />321 <br />321 <br />LF <br />$ <br />721 <br />$ <br />2,314.41 <br />equip, materials) <br />Portland cement <br />DW -29 <br />grout - 2 in. (labor, <br />2 <br />320 <br />320 <br />LF <br />$ <br />7.21 <br />$ <br />2,307.20 <br />equip, materials) <br />Portland cement <br />DW -30 <br />grout - 2 in. (labor, <br />2 <br />320 <br />320 <br />LF <br />$ <br />7.21 <br />$ <br />2,307.20 <br />equip, matenals) <br />Portland cement <br />DW -31 <br />,grout - 2 in. (labor, <br />2 <br />320 <br />320 <br />LF <br />$ <br />7.21 <br />$ <br />2,307.20 <br />equip, materials) <br />DW -32 <br />Portland cement <br />grout - 2 in. (labor, <br />2 <br />320 <br />320 <br />LF <br />$ <br />7.21 <br />$ <br />2,307.20 <br />equip, materials) <br />Portland cement <br />East Pyeatt Well # 1 <br />grout - 5 in. (labor, <br />5 <br />700 <br />700 <br />LF <br />$ <br />10.69 <br />$ <br />7,482.86 <br />equip, materials) <br />Portland cement <br />81-03A <br />grout - 2 in. (labor, <br />2 <br />650 <br />650 <br />LF <br />$ <br />7.21 <br />$ <br />4,686.50 <br />equip, materials) <br />Coy -A <br />Portland cement <br />grout - 2 in. (labor, <br />2 <br />50 <br />50 <br />LF <br />$ <br />7.21 <br />$ <br />360.50 <br />equip, materials) <br />Coy -B <br />Portland cement <br />grout - 2 in. (labor, <br />2 <br />42 <br />42 <br />LF <br />$ <br />7.21 <br />$ <br />302.82 <br />equip, materials) <br />Portland cement <br />GC3A <br />grout - 2 in. (labor, <br />2 <br />43 <br />43 <br />LF <br />$ <br />7.21 <br />$ <br />310.03 <br />equip, materials) <br />GC3B <br />Portland cement <br />grout - 2 in. (labor, <br />2 <br />60 <br />60 <br />LF <br />$ <br />7.21 <br />$ <br />432.60 <br />equip, materials) <br />GP3A <br />Portland cement <br />grout - 2 in. (labor, <br />2 <br />136 <br />136 <br />LF <br />$ <br />7.21 <br />$ <br />980.56 <br />equip, materials) <br />Portland cement <br />GC1 <br />grout - 2 in. (labor, <br />2 <br />177 <br />177 <br />LF <br />$ <br />7.21 <br />$ <br />1,276.17 <br />equip, materials) <br />GC2 <br />Portland cement <br />grout- 2 in. (labor, <br />2 <br />158 <br />158 <br />LF <br />$ <br />7.21 <br />$ <br />1,139.18 <br />equip, materials) <br />Portland cement <br />GC3 <br />grout - 2 in. (labor, <br />2 <br />61 <br />61 <br />LF <br />$ <br />7.21 <br />$ <br />439.81 <br />equip, materials) <br />
The URL can be used to link to this page
Your browser does not support the video tag.