Laserfiche WebLink
Appendix A Bond Revision Table A-13.4 Page No. 44 <br />Borehole Sealing Work <br />Borehole Sealing/Item <br />Description Method Diameter Length Quantity Unit Unit Cost Total Costs <br />Portland cement <br />GLEV-1 <br />grout - 8in. <br />6.625 <br />39 <br />39 <br />LF <br />$ 11.21 <br />$ 437.19 <br />0 to 39 Feet <br />(labor, equip, <br />materials) <br />Portland cement <br />GLEV-1 <br />grout-6in. <br />4.5 <br />199 <br />199 <br />LF <br />$ 10.65 <br />$ 2,119.35 <br />39 to 238 Feet <br />(labor, equip, <br />materials) <br />Portland cement <br />GLEV-2 <br />grout - 6in. <br />4.5 <br />27 <br />27 <br />LF <br />$ 10.65 <br />$ 287.55 <br />27 Feet <br />(labor, equip, <br />materials) <br />Portland cement <br />GLEV-3 <br />grout - 6in. <br />6.625 <br />29 <br />29 <br />LF <br />$ 11.21 <br />$ 325.09 <br />0 to 29 Feet <br />(labor, equip, <br />materials) <br />Portland cement <br />GLEV-3 <br />grout - 6in. <br />4.5 <br />16 <br />16 <br />LF <br />$ 10.65 <br />$ 170.40 <br />29 to 45 Feet <br />(labor, equip, <br />materials) <br />PVC plug - 6 in. <br />Plug Holes <br />diameter <br />NA <br />NA <br />3 <br />EA <br />$ 53.04 <br />$ 159.12 <br />borehole <br />Exlposed casing <br />Cut Casings <br />g <br />removal - Calculate <br />4.5 to 6.625 <br />4.65 <br />4.65 <br />LF <br />$ 1.76 <br />$ 8.18 <br />Circumference in <br />Linear Feet <br />Borehole <br />Mark Holes <br />location/identification <br />NA <br />NA <br />1 <br />EA <br />$ 3.47 <br />$ 3.47 <br />markere (EA, <br />material cost only) <br />