My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-09_PERMIT FILE - M2016026
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016026
>
2016-09-09_PERMIT FILE - M2016026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 5:26:38 PM
Creation date
9/13/2016 10:05:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016026
IBM Index Class Name
Permit File
Doc Date
9/9/2016
Doc Name
Adequacy Review Response #2
From
Greg Lewicki and Associates, PLLC
To
DRMS
Email Name
ACY
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L WORST CASE RECLAMATION SCENARIO <br /> The worst case reclamation scenario at the 5 Mile Pit will be when the greatest backfill is required <br /> and the greatest dewatering is necessary to install said backfill. This will be at some point during <br /> the mining of Phase 1. The backfill quantity is limited by a combination of the county permit(no <br /> more than 1000 feet of unbackfilled mining slope) and the maximum depth of the final lake. This <br /> can be found in Phase 1. The lake area at this point will be 7.3 acres. <br /> Option 1 -Exposing Groundwater <br /> 1. Dewatering 7.3 acre lake that is 12 feet deep on average. 87.6 ac-ft @$75/ac-ft= $6,570 <br /> 2. Backfill to the lake level to close off exposed groundwater. 87.6 ac-ft= 141,328 CY. <br /> 141,328 CY @ $1.50/CY to haul and place= $211,992 <br /> 3. Backfilling 1000 feet of 1.5H:1 V mining slope to 3H:1 V for a highwall height of 10 feet. <br /> 2,700 CY at$1.50/CY to haul and place= $4,050 <br /> 4. Backfill and grade detention pond. 6,200 CY @ $1.50/CY to haul and place=$9,300 <br /> 5. Rip road areas in preparation for topsoiling.4 acres @ $250/ac. =$1,000 <br /> 6. Replace topsoil on all disturbed areas. Assuming all areas disturbed except for Phases 2 and <br /> 3. 25.6 acres to a depth of 12 inches. 41,301 CY @ $1.50 CY to haul and place=$61,952 <br /> 7. Remove all facilities and equipment. $5,000 <br /> 8. Seeding and mulching all areas above water line. 25.6 acres @$700/acre= $17,920 <br /> Based on these costs, and a 28%DRMS cost factor,the total bond for the 5 Mile Pit should be <br /> $424,620. <br /> Option 2-Exposing Groundwater <br /> 1. Dewatering 7.3 acre lake that is 12 feet deep on average. 87.6 ac-ft @ $75/ac-ft=$6,570 <br /> 2. Backfilling 1000 feet of 1.5H:1 V mining slope to 3H:1 V for a highwall height of 2 feet. <br /> 2,700 CY at $1.50/CY to haul and place= $4,050 <br /> 3. Backfill and grade detention pond. 6,200 CY @ $1.50/CY to haul and place= $9,300 <br /> 4. Rip road areas in preparation for topsoiling. 4 acres @ $250/ac. = $1,000 <br /> 5 Mile Pit March 2016 L-1 <br />