My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-09_PERMIT FILE - M2016026
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016026
>
2016-09-09_PERMIT FILE - M2016026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 5:26:38 PM
Creation date
9/13/2016 10:05:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016026
IBM Index Class Name
Permit File
Doc Date
9/9/2016
Doc Name
Adequacy Review Response #2
From
Greg Lewicki and Associates, PLLC
To
DRMS
Email Name
ACY
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Replace topsoil on all disturbed areas. Assuming all areas disturbed except for Phases 2 and <br /> 3. 25.6 acres to a depth of 12 inches. 41,301 CY @ $1.50 CY to haul and place=$61,952 <br /> 6. Remove all facilities and equipment. $5,000 <br /> 7. Seeding and mulching all areas above water line. 25.6 acres @ $700/acre=$17,920 <br /> Based on these costs, and a 28% DRMS cost factor, the total bond for the 5 Mile Pit should be <br /> $135,414. <br /> Worst case reclamation costs for each scenario are shown in Table L-1 below: <br /> 5 Mile Pit March 2016 L-2 <br />