Laserfiche WebLink
September 8, 2016 C-1982-056/Foidel Creek Mine JLE <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 7 of 11 <br /> <br /> Figure 8. Pipeline Corridor From East End Looking West. <br /> TC will need to place disturbance boundary markers along the p ipeline corridor in accordance with Rule <br />4.02.3. <br /> <br />OTHER (SPECIFY): <br />The following maintenance items were observed during the Division ’s previous inspections. Below is a list of <br />these items and a discussion of their current status. <br /> Ditch F-1 north of the P.M. Bay needs to be repaired and positive drainage to Pond F needs to be re - <br />established. <br />o This item has been addressed. TC decided not to install culverts but cleaned out and re - <br />established water bars that direct the water to Pond F. <br /> Please re-seed the sparse areas of vegetation on the Pond C embankment. <br />o Brian Watterson indicated that they would wait until the fall to conduct seeding at this site. <br /> Please make the necessary repairs and adjustments to the flume and weir at ponds F and G. <br />o The weir at Pond G has been repaired. Maintenanc e is still required at Pond F. <br /> Please cleanout the ditch south of the rail line east of the train loadout and clean out the sediment traps and <br />rock check dams as depicted on Exhibit 49DD -F1 in the permit. <br />o This item remains outstanding. <br /> The culvert under the haul road to the old stoker Coal Storage and Loadout area needs to be cleaned out. <br />Also Ditch E-1 that drains to Pond E is partially filled with sediment and cattails and needs to be cleaned <br />out. The ditch and culvert must be maintained to have adequate drainage in acc ordance with Rule <br />4.03.1(4). <br />o The ditch has been cleaned out and drainage has been reestablished. The culv ert is nearly full of <br />sediment and needs to be cleaned out.