Laserfiche WebLink
Exhibit D: Mining plan South Pit. <br /> Currently the South pit has a Crushing, Screening& Stockpile area of acres, as noted on Flap. <br /> Highwall un-reclaimed will not go over 50' in height with a 1-1 slope. <br /> Active mining area plan is to proceed to tlic South into the High`Nall with planned benching with <br /> 3-1 slopes. Spacing on the benching will be 10' wide and 30' high. <br /> Once active mining has reached its southern most boundaries, it will be left at a 3-1 slope for <br /> reclaim. <br /> The same technique will be used to proceed to the East onto future mining area of 1.55 acres. All <br /> stockpile will be left on active mining area. Disturbed mining area will not be over 5 acres at one <br /> time. <br /> Retention pond at the bottom of the South Pit entrance hill will be maintained for run off. <br />