Laserfiche WebLink
Exhibit L: Reclaniation Plan South Pit <br /> Benching of the High wall NVzll be utilized to make slopes for reclaim with spacing on die benching <br /> will be 10' wide and 30' high. BLN1 will also need to approve tic exposed high well remaining. <br /> There is little brush or topsoil on these gravel deposits. In some pockets it is deeper than other <br /> areas. The amount that is there will be collected, put in a topsoil pile and re-spread over the <br /> disturbed area approximately 2"- 3" in depth alter mining is complete. All compacted areas will be <br /> ripped to a minimum of 18" prior to topsoil replacement. 'Topsoil will be harrowed level and drill <br /> seeded and broadcast seeded where necessary. The only mulch used will be sagebrush and old <br /> trees that were saved in the area from excavation. <br /> We plan on moving from'vVcst to Last following the active mining area. Overburden and topsoil <br /> will be moved to rear of active mining and placed for reclamation. <br /> Alter the brush topsoil mixture has been spread over the disturbed area, we will seed that area with <br /> a mixture of grass seed as per NRC recommendations. (See Attached) <br />