Laserfiche WebLink
Truck Maneuver and Dump 1.00 Minutes <br />Time: <br />Truck Travel (Haul& Return) Time: <br />maintained 3.0 <br />Haul Route: <br />Page 16 of 138 <br />Adjustedforsitealtitude: 1.000 Minutes <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered <br />Seg # <br />HaulDistance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />N <br />Total Res <br />N <br />Velocity <br />(fpm) <br />Travel <br />��) <br />1 <br />365.00 <br />-2.60 <br />3.00 <br />0.40 <br />4254 <br />0.622 <br />2 <br />525.00 <br />-8.69 <br />3.00 <br />-5.69 <br />1693 <br />0.437 <br />3 <br />1 1760.00 <br />1 -6.25 <br />1 3.00 <br />1 -3.25 <br />1 3053 <br />0.642 <br />4 <br />1 900.00 <br />1 -5.30 <br />1 3.00 <br />1 -2.30 <br />1 3893 <br />0.286 <br />Haul Time: 1.987 minutes <br />Return Route: <br />Seg # <br />HaulDistance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />N <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />900.00 <br />5.30 <br />3.00 <br />8.30 <br />2120 <br />0.555 <br />2 <br />1760.00 <br />6.25 <br />3.00 <br />9.25 <br />2000 <br />0.878 <br />3 <br />1 525.00 <br />1 8.69 <br />1 3.00 <br />1 11.69 <br />1 1477 <br />0.321 <br />4 <br />1 365.00 <br />1 2.60 <br />1 3.00 <br />1 5.60 <br />1 2851 <br />0.277 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.331 /LCY <br />Total job time <br />Totaljob cost <br />63.46 Hours <br />$112,812 <br />CIRCES Cost Estimating So$ware <br />Return Time: 2.031 <br />minutes <br />Total Truck Cycle Time: 6.668 <br />minutes <br />Loading Toolunit <br />Production <br />928.36 LCY/Hour Adjusted forjob efficiency: <br />770.54 LCY/Hour <br />TruckUnit Production <br />229.72 LCY/Hour Adjustedforjob efficiency: <br />190.67 LCY/Hour <br />Optimal No. ofTrucks: <br />4 Truck(s) Selected NumberofTrucks: <br />4 Truck(s) <br />Adjustedhourlytruck teamproduction: 762.68 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 762.68 <br />LCY/Hour <br />Adjustedmultiple truck/loaderteamproduction: 762.68 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.331 /LCY <br />Total job time <br />Totaljob cost <br />63.46 Hours <br />$112,812 <br />CIRCES Cost Estimating So$ware <br />