Laserfiche WebLink
Description: Coal - Bituminous, Raw <br />Rated Payload: 82,000 Pounds <br />Payload Capacity: 51.25 LCY <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />21.60 <br />LCY <br />Heaped Volume: <br />31.70 <br />LCY <br />Average Volume: <br />26.65 <br />LCY <br />Adjusted Volume: <br />31.70 <br />LCY <br />Final Truck Volume Based on Number ofLoaderPasses: <br />Loading ToolCapacitX <br />Page 15 of 138 <br />25.53 LCY <br />Bucket Size Class: NA <br />Rated Capacity: 9.200 LCY (heaped) <br />Bucket Fill Factor: 0.925 Loose material- 1/8" to 3/8" (90 - 95%) 0.925 <br />Adjusted Capacity: 8.510 LCY <br />Job Condition Corrections: Site Altitude (ft.): 6800 feet <br />Net Correction: I 0.830 I 0.830 <br />Loading Tool Cycle Time: Number of Loading ToolPasses Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders —Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: <br />Wheeland TrackLoaders -Unadjusted Basic Loader Cycle Time (load, dump, <br />maneuver): <br />3 passes <br />0.575 minutes <br />Cycle Time Factors <br />Truck Loader <br />Source <br />Source <br />Altitude Ad': <br />1.000 1.000 <br />(CAT HB) <br />(Cat HB) <br />Job Efficiency: <br />0.830 0.830 <br />(CAT HB) <br />(Cat HB) <br />Net Correction: I 0.830 I 0.830 <br />Loading Tool Cycle Time: Number of Loading ToolPasses Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders —Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: <br />Wheeland TrackLoaders -Unadjusted Basic Loader Cycle Time (load, dump, <br />maneuver): <br />3 passes <br />0.575 minutes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Material 1/8" to 3/4" diameter -0.02 <br />-0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor ordozerpiled 10 ft. high and up <br />0.000 <br />(Cat HB) <br />0.00 <br />Truck Ownership: <br />Common ownership oftrucks and loaders - <br />-0.040 <br />(Cat HB) <br />0.04 <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net C Acle lune Adjustment: -U.IUU minutes <br />AdjustedLoader Cycle Time: 0.475 minutes <br />Net Load Time per Truck: 1.050 minutes <br />Truck Cycle Time: <br />TruckExchange Time: 0.60 Minutes Adjustedforsite altitude: 0.600 Minutes <br />Truck Load Time: 1.050 Minutes Adjusted for site altitude: 1.050 Minutes <br />CIRCES Cost Estimating So$ware <br />