Laserfiche WebLink
BULLDOZER WORK <br />Task description: Regrade Cut Material Over 6.93 ROM Coal Area <br />Site: Peabody Sage Creek Mine Perinit Action: RN1-2015 <br />PROJECT IDENTIFICATION <br />Task#: 010 <br />Date: 8/31/2016 <br />1:03:13 PM <br />State: Colorado <br />County: Routt <br />User: JLE <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi -Universal <br />Attachment: 3-s h ank ripp er <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/flour: <br />111 IN♦ <br />Page 17 of 138 <br />Permit/Job#: C2009087 <br />Abbreviation: None <br />Filename: C087-010 <br />$82.01 <br />Utilization % <br />NA <br />$79.23 <br />100 <br />$8.40 <br />NA <br />$0.00 <br />0 <br />$38.89 <br />NA <br />Total unitCost/Hour: $208.53 <br />Total Fleet Cost/Hour: $208.53 <br />MATERIAL QUANTITIES <br />Initial Volume: 16,770 <br />Swell factor: 1.125 <br />Loosevolume: 18,866 LCY <br />Source ofestimatedvolume: Division ofReclamation, Mining & Safety <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight <br />100 feet <br />852.6 LCY/hr <br />Partly consolidated stockpile 1.1 <br />0% <br />6,800 feet <br />2,650 lbs/LCY <br />CIRCES Cost Estimating Solware <br />