August 17, 2016 C-1992-081/Hayden Gulch Loadout JHB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 6 of 8 <br /> <br />Reclamation 4.03.1(7)/4.03.2(7): <br /> A discussion of the tie across haul road was already noted regarding dust control. The division has not <br />received any revisions regarding final disposition of the haul road. At this time the haul road is approved to be <br />reclaimed when no longer needed. <br /> <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br /> Demolition of the rail line, ties and ballast has necessitated re-disturbance of portions of previously <br />reclaimed areas. The contractor appears to be keeping re-disturbance to a minimum. When the work is completed <br />and the area ripped and reseeded, HGT will need to define where the 2016 disturbance is. The contractor has not <br />salvaged topsoil on the work/laydown areas. HGT needs to determine if compaction has occurred from running <br />equipment over the soil prior to seeding these re-disturbed areas. <br /> <br />The contactor informed the inspector that rail, ties, all metal plates and spikes, and the rock ballast is being hauled <br />off-site. The contractor has small piles of salvage material in the work areas. Based on the size of the piles much <br />of the material has already been hauled away. <br /> <br /> <br />Photo 10: Contractor has dozed a travel way/work Photo 11: Track & ties removed from rail loop on west side of <br />Area on the north side of the tracks. Demo of train RCR #37 <br />Loop progresses. <br />