My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-19_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2016-08-19_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:00 PM
Creation date
8/22/2016 10:33:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
8/19/2016
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Tri-State Generation and Transmission Association
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Page 4 of 67 <br />Site Altitude: 7400 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Page 4 of 67 <br />Site Altitude: 7400 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />7500.00 <br />2.50 <br />3.00 <br />5.50 <br />1477 <br />5.15 <br />Haul Time: 5.15 minutes <br />Return Route - <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />7500.00 <br />-2.50 <br />3.00 <br />0.50 <br />2965 <br />2.64 <br />Return Time: <br />2.64 <br />minutes <br />Total Scraper team cycle time: <br />9.39 <br />minutes <br />Adjusted for job conditions: <br />307.60 <br />LCY/Hour <br />Selected Number of Scrapers: <br />4 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />615.21 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,845.62 <br />LCY/Hour <br />Unadjusted unit production/hour: 370.61 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 3 Team(s) <br />Unit cost: $2.532 /LCY <br />Total job time: 102.03 Hours <br />Total job cost: $476,749 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.