Laserfiche WebLink
Page 3 of 67 <br />SCRAPER TEAM WORK <br />Task description: Collom-Haul Topsoil from TS -25A to temp sp. SS <br />Site: Colowyo Coal Mine Permit Action: PR4 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 501 State: Colorado <br />Date: 8/4/2016 County: Moffat <br />User: JHB <br />Agency or organization name <br />HOURLY EQUIPMENT <br />DRMS <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Abbreviation: None <br />Filename: C019-501 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown: Scraper Work Team Support Eauipment Maintenance Eauipment <br />Total work team cost/hour: $4,672.61 <br />MATERIAL OUANTITIES <br />Initial volume: 167,387 CCY Swell factor: 1.125 <br />Loose volume: 188,310 LCY <br />Source of estimated volume: Map 23B, 4" mean <br />Source of estimated swell factor: Cat Handbook <br />h[I 1119 ala 9 till 11O Y [IN <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$148.54 <br />NA <br />NA <br />NA <br />$79.03 <br />$26.43 <br />Operating cost/hour: <br />$192.54 <br />NA <br />NA <br />NA <br />$17.29 <br />$10.19 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$34.24 <br />NA <br />NA <br />NA <br />$35.83 <br />$0.00 <br />Unit Subtotals: <br />$375.32 <br />NA <br />NA <br />NA <br />$132.15 <br />$36.62 <br />Number of Units: <br />12 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$4,503.84 <br />Support: <br />$0.00 <br />Maint: <br />$168.77 <br />Total work team cost/hour: $4,672.61 <br />MATERIAL OUANTITIES <br />Initial volume: 167,387 CCY Swell factor: 1.125 <br />Loose volume: 188,310 LCY <br />Source of estimated volume: Map 23B, 4" mean <br />Source of estimated swell factor: Cat Handbook <br />h[I 1119 ala 9 till 11O Y [IN <br />Material weight: <br />2,550 lbs/LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />32.00 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />