Laserfiche WebLink
Page 2 of 67 <br />551 <br />Haul Spoil from Temp spoil pile to Collom pit <br />(2017 W -C) <br />TRUCKI <br />2 <br />8,300.97 <br />$68,935,004.00 <br />SUBTOTALS: <br />25274.18 <br />$85,646,000 <br />110131.11019] 1[0193.41 lk� <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />$1,730,049.20 <br />Performance bond: <br />1.05 <br />Total = <br />$899,283.00 <br />Job superintendent: <br />12,546.57 <br />Total = <br />$934,468.53 <br />Profit: <br />10.00 <br />Total = <br />$8,564,600.00 <br />TOTAL O & P = <br />$12,128,400.73 <br />CONTRACT AMOUNT (direct + O & P) = <br />$97,774,400.73 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />500.00 <br />2.00 <br />5.00 <br />CONTINGENCY: 0.00 <br />Total = 500.00 <br />Total = $1,955,488.01 <br />$4,888,720.04 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $18,973,108.78 <br />TOTAL BOND AMOUNT (direct + indirect) = $104,619,108.78 <br />CIRCES Cost Estimating Software <br />