My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-19_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2016-08-19_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:00 PM
Creation date
8/22/2016 10:33:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
8/19/2016
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Tri-State Generation and Transmission Association
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 67 <br />SCRAPER TEAM WORK <br />Task description: Collom-Haul Topsoil from TS 25A to 286.4 ac. SS area <br />Site: Colowyo Coal Mine Permit Action: PR4 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 502 State: Colorado <br />Date: 8/4/2016 County: Moffat <br />User: JHB <br />Agency or organization name <br />HOURLY EQUIPMENT <br />DRMS <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Abbreviation: None <br />Filename: C019-502 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown: Scraper Work Team Support Eauipment Maintenance Eauipment <br />Total work team cost/hour: $1,670.05 <br />MATERIAL OUANTITIES <br />Initial volume: 152,479 CCY Swell factor: 1.125 <br />Loose volume: 171,539 LCY <br />Source of estimated volume: Map 23B & reclamation plan <br />Source of estimated swell factor: Cat Handbook <br />h[I 1119 ala 9 till 11O Y [IN <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$148.54 <br />NA <br />NA <br />NA <br />$79.03 <br />$26.43 <br />Operating cost/hour: <br />$192.54 <br />NA <br />NA <br />NA <br />$17.29 <br />$10.19 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$34.24 <br />NA <br />NA <br />NA <br />$35.83 <br />$0.00 <br />Unit Subtotals: <br />$375.32 <br />NA <br />NA <br />NA <br />$132.15 <br />$36.62 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,501.28 <br />Support: <br />$0.00 <br />Maint: <br />$168.77 <br />Total work team cost/hour: $1,670.05 <br />MATERIAL OUANTITIES <br />Initial volume: 152,479 CCY Swell factor: 1.125 <br />Loose volume: 171,539 LCY <br />Source of estimated volume: Map 23B & reclamation plan <br />Source of estimated swell factor: Cat Handbook <br />h[I 1119 ala 9 till 11O Y [IN <br />Material weight: <br />2,550 lbs/LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />32.00 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.