hauled to processing equipment. Scrapers and dozers will once again be used to backfill <br /> finished areas as they are mined. <br /> 15. What equipment will be used forearthmoving? <br /> The mobile equipment used in mining will thus consist of bulldozers,scrapers, front-end <br /> loaders, and haul trucks. <br /> 16. If not addressed in Exhibit G,please describe all water diversions and impoundments. This <br /> includes any ditches or berms for stormwater. <br /> As shown on Map C-2, a small detention pond will be used to control the water discharge <br /> from pit dewatering. The mining pit itself will act as a detention structure during mining. <br /> 17. The nature, depth and thickness of the deposit to be mined and the thickness and type of <br /> overburden to be removed(may be marked"CONFIDENTIAL," pursuant to Paragraph <br /> 1.3(3)); <br /> The alluvium deposit is roughly 30 feet deep, as shown by the pit topography on Map C-2. <br /> 18. The nature of the stratum immediately beneath the material to be mined in sedimentary <br /> deposits <br /> The bedrock beneath the alluvium are the sandstones of the Mesaverde Group. <br /> 19. Topsoil and overburden piles need to be included in affected acreage. Introduction differs from <br /> exhibits. Total maximum affected is 51 acres. <br /> See the revised Map C-2,which shows the that the topsoil and overburden piles are within the <br /> affected area. The maximum affected area is 51 acres, 40.7 acres of which will be the pits <br /> themselves. <br /> 20. Please specify the maximum height of highwalls and maximum slope. Map C-3 states 1.5:1 <br /> while mining, please state this in the narrative portion. <br /> Mining will take place to perimeter slopes of 1.5H:1V. A maximum of 1000 feet of <br /> unbackfilled slope will be open at any given time. <br /> 21. Clarify that according to the reclamation plan a maximum of 1400 ft. of un-reclaimed slope may <br /> exist. Which is up to 1000 ft. maybe un-backfilled.And up to 400 ft. of graded slope maybe un- <br /> topsoiled at any given time. Which means a total of 1400 ft. of slope will require topsoil. <br /> A maximum of 1000 ft of mined out slope may be unbackfilled at any time. Beyond that, a <br /> maximum of 400 ft of backfilled, but not topsoiled, slope may be present at any time. <br /> 22. No inert fill form was attached. Please attached the referenced form. Also please include a <br /> statement that fill will meet the definition of Rule 1.1(20) <br /> An inert fill form is attached. Any inert material will conform to the definition found in Rule <br /> 1.1.(20). <br /> 23. Please clarify in the narrative portion which buildings are what(temporary/permanent). Specify <br /> construction material (building and foundation type),dimensions for all permanent structures. <br /> All structures used for mining (office, scale, etc.)will be removed following mining. The office <br /> will be a mobile trailer structure. The fuel storage area will be a bermed area,with no <br /> structure. The truck scale consists of an inground scale (roughly 20' x 60') and a scale house. <br /> The scale will sit on a set of concrete blocks (3 -3' x 10' x 2' blocks). <br /> 24. How you will address reject material generated from the asphalt and cementplants. <br />