Laserfiche WebLink
Reject asphalt and concrete will be recycled whenever possible through the plants when they <br /> are on site. <br /> 25. Please address SPCC measures. Please state that all hazardous materials will be kept in a <br /> secondary containment. <br /> All hazardous materials (diesel, oil,etc.)will be stored in secondary containment that will <br /> have a volume of 110% of the largest container. An SPCC plan will be in place for the site <br /> prior to any applicable materials coming on site. In the event of any spill,the operator will <br /> inform the Division and other appropriate regulators in accordance with Rule 3.1.13. <br /> 26. Will any of the existing roads depicted in your maps be upgraded to support this activity? <br /> No existing road upgrades will be necessary for this operation. <br /> 27. Will any additional utilities be brought in to support the site? <br /> No additional utilities will be brought in to support the site. <br /> 28. Please clarify that any topsoil stockpiled for more than 180 days will be stabilized by <br /> seeding with the temporary mix listed in table E-2. <br /> Any topsoil stockpiled for more than 180 days will be stabilized by seeding with the seed mix <br /> listed in Table E-2. <br /> Exhibit E—Reclamation Plan <br /> 29. A comparison of the proposed post-mining land use to other land uses in the vicinity and to <br /> adopted state and local land use plans and programs. <br /> All areas above the lake water level will be returned to their pre mine uses. Reclaimed ponds <br /> and lakes are frequently found along the Colorado River in Garfield County and beyond. The <br /> site is zones Rural by the county,which is the same as its neighbors to the east,west, and <br /> south. No known state land use plan is applicable to this area. <br /> 30. Will any soil testing be done? <br /> No soil testing will be done. <br /> 31. Please clarify if trees, shrubs, etc. will be planted. If so please specify the types, quantities, size <br /> and location. <br /> No trees or shrubs will be planted as part of the reclamation of the 5 Mile Pit. <br /> 32. Roads and processing areas will be compacted and require ripping.Please state that compacted <br /> areas will be ripped a minimum of 18 inches and include the anticipated number of acres to be <br /> ripped in Exhibit L. <br /> Four acres of internal road will be ripped during reclamation. Ripping at an estimated cost of <br /> $250/acre adds$1,280 (including the 28% DRMS cost factor) to the bond calculations found <br /> in Exhibit L. <br /> 33. What features/buildings will require demolition? <br /> No features or buildings will require demolition,as all either be covered by site regrading, or <br /> are mobile structures that will simply be taken off site. <br /> 34. A single annual treatment/survey of weeds in April is inadequate. Treatment type and timing <br /> differ for each species.Please revise your weed management plan to effectively treat all noxious <br />