Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No. M-88-112 <br /> July 2016 Monthly Report <br /> Page 2 <br /> Table 1-July 2016 Ground Water Monitoring Well and Lysimeter Depth to Water <br /> Measurements <br /> Monitoring Site Date Depth to Water(feet) <br /> M-4R 7/28/16 0 <br /> M-6 7/28/16 Dry <br /> M-7 7/28/16 Dry <br /> M-8 7/28/16 Dry <br /> M-9 7/28/16 141.65 <br /> M-10 7/28/16 25.38 <br /> M-11 R 7/28/16 40.69 <br /> M-12 7/28/16 175.38 <br /> M-13R 7/28/16 126.37 <br /> M-14 7/28/16 131.40 <br /> M-15 7/28/16 90.06 <br /> M-16 7/28/16 22.19 <br /> M-19 7/28/16 24.72 <br /> M-21 7/28/16 18.94 <br /> M-22 7/28/16 17.30 <br /> M-26 7/28/16 16.42 <br /> M-32 7/28/16 48.74 <br /> M-33 7/28/16 54.31 <br /> M-34 7/28/16 23.73 <br /> BF-4 7/28/16 24.95 <br /> BF-6 7/28/16 30.96 <br /> LS-1 R 7/28/16 Dry <br /> LS-2R 7/28/16 Dry <br /> LS-3 7/28/16 Dry <br /> LD-1 R 7/28/16 Dry <br /> LD-2R 7/28/16 Dry <br /> LD-3 7/28/16 Dry <br /> Table 2—July 2016 Tailing Disposal Area Piezometer Depth to Water <br /> Piezometer Date Depth to Water Total Depth(ft) Volume of <br /> (feet) Water(ft) <br /> P6 7/25/16 Dry 72.46 0.00 <br /> P7 7/25/16 92.28 92.50 0.22 <br /> P8 7/25/16 96.86 97.51 0.65 <br /> P9 7/25/16 71.93 72.30 0.37 <br />