My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-15_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2016-08-15_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 11:06:04 PM
Creation date
8/16/2016 9:45:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
8/15/2016
Doc Name
Monthly Report- July 2016
From
Battle Mountain Resources, Inc.
To
DRMS
Annual Report Year
2016
Report Quarter_Month
Jul
Email Name
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R rs!fED <br /> 4,,-AUG 15 2016 <br /> DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> BATTLE MOUNTAIN RESOURCES, INC. <br /> August 09, 2016 <br /> Mr. Wally Erickson <br /> State of Colorado <br /> Division of Reclamation,Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Re: Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112// <br /> July 2016 Monthly Report j/ <br /> Dear Mr. Erickson: <br /> The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br /> San Luis Project for the month of July 2016. <br /> Surface and ground water monitoring and analysis were completed for all required sites during the month <br /> per the terms and conditions of the TR-32 Quality Assurance and Quality Control(QA/QC)plan. <br /> Vacuum on the tailing lysimeters was verified on July 28th, no water was present for sampling and <br /> subsequent analysis. <br /> Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br /> Pit monitoring wells on July 25`h. The July tailing impoundment piezometer measurements identified <br /> these installations were either dry or contained less than 12 inches of water as illustrated in Table 2. <br /> Tables 1 and 2 below identify the depth to water measurements collected for each of the site monitoring <br /> wells,piezometers and lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br /> The leak detection system was measured on July 25`h. A total of 880 gallons of water was excavated from <br /> the leak detection system yielding a monthly average of 32.5 gpad. The tailings pond under-drain <br /> measured 40.0 gpm. <br /> During the month of July,the West Pit water treatment plant operated efficiently discharging a total of <br /> 7,370,300 gallons(22.62 acre-feet)of water to Rito Seco Creek and a total of 646,200 gallons(1.98 acre- <br /> feet)of water was transferred from the West Pit to the tailings impoundment. Seepage along Rito Seco <br /> Creek remained dry during the month. <br /> P.O.Box 310 • San Luis,Colorado 81152-0310 • (719)379-0798 • Fax(719)379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.