Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No. M-88-112 <br /> July 2016 Monthly Report <br /> Page 3 <br /> Table 2—July 2016 Tailing Disposal Area Piezometer Depth to Water <br /> Measurements(continued) <br /> Piezometer Date Depth to Water Total Depth (ft) Volume of <br /> (feet) Water ft <br /> P10 7/25/16 57.36 58.30 0.94 <br /> PH l 7/25/16 41.37 41.80 0.43 <br /> P 12 7/25/16 41.69 41.71 0.02 <br /> P13 7/25/16 41.00 1 41.34 1 0.34 <br /> P 14 7/25/16 Dry 41.24 0.00 <br /> P15 7/25/16 40.85 41.10 0.25 <br /> Table 3 below provides the calendar year 2016 sludge management for the San Luis site. <br /> Table 3 -Water Treatment Plant Sludge Management Year to Date. <br /> Date Quantity Sludge Management <br /> August 2015 104 tons Sludge transferred from Pond#3 to drying <br /> pad. <br /> July 2016 104 tons Sludge transferred from drying pad to tailings <br /> impoundment. <br /> Should you have any questions or comments, please do not hesitate to contact either myself at <br /> (719)379-0798 or Mr. Larry Fiske at(303) 837-5676. <br /> Sincerely, <br /> r <br /> Ju io F. Madrid <br /> Sr. Supervisor Legacy Sites Reclamation and Closure <br /> Cc: Larry Fiske <br /> File <br />