Brock Bowles -3- August 12, 2016 <br />Sediment Pond 7 - 0.5 acres for Phase III release - #5 on SCC ARR. <br />In October 2011 approximately 0.5 acres at Pond 7 were backfilled, graded and seeded <br />Phase I and II bond release on the 0.5 acres was approved on November 14, 2015 with <br />SL -8. (Area #6 on Bond Release Map) <br />Sediment Pond 8 - 0.5 acres for Phase II & III release (Commercial Postmining <br />Land Use) - #29 on SCC ARR. <br />In October 2011 approximately 0.5 acres at Pond 8 were backfilled, graded and seeded. <br />Phase I bond release on the 0.5 acres was approved on November 14, 2015 with SL -8. <br />(Area #7 on Bond Release Map) <br />Sediment Pond 9 - 0.4 acres for Phase II & III release - #8 on SCC ARR. <br />In April 2013 approximately 0.4 acres at Pond 9 were backfilled, graded and seeded. <br />Phase I bond release on the 0.4 acres was approved on November 14, 2015 with SL -8. <br />(Area #8 on Bond Release Map) <br />G Substation - 0.6 acres for Phase II release - #9 on SCC ARR. <br />In September 2008 all structures were removed at the G Substation. Approximately 0.5 <br />acres were backfilled and graded to approximate original contours, top -soiled and seeded <br />and approximately 0.1 acres were re -disturbed and re -seeded during reclamation of <br />drainage features. Phase I bond release on 0.1 acres were approved on October 27, <br />2003 with SL -2 and on 0.5 acres on November 14, 2015 with SL -8. (Area #9 on Bond <br />Release Map) <br />Cameo Refuse Disposal Area 1 Road (CRDA1 Road) -1.2 acres for Phase II release <br />- #32 on SCC ARR. <br />In September 2010 approximately 1.2 acres of the CRDA1 "access" road were backfilled, <br />graded, top -soiled and seeded. Phase I bond release on the 1.2 acres was approved on <br />November 14, 2015 with SL -8. (Area #10 on Bond Release Map) <br />Cameo Refuse Disposal Area 1 Redisturbed Area (CRDA1 Top) -1.0 acres for <br />Phase II release - #18 on SCC ARR. <br />In September 2010 approximately 1.0 acres of the CRDA1 Top was graded and re- <br />seeded. This area had been redisturbed in December 2009 when it had been used as a <br />lay down area for coal refuse from McClane Canyon Mine and remaining SCC coal fines <br />clean up. Topsoil, salvaged prior to redisturbance, was distributed over area prior to <br />seeding. Phase I bond release on the 1.0 acres was approved on October 27, 2003 with <br />SL -2. (Area #11 on Bond Release Map) <br />Undisturbed Areas - 0.2 acres for Phase III release. <br />There are 0.2 acres at the Roadside North Portal being submitted in this application for a <br />Phase III release. These acres have no surface disturbance associated with them, but <br />have been affected by underground mining. (Area #12 on Bond Release Map) <br />16. A description of results achieved: <br />Acres submitted for Phase II release (2.8 acres) <br />The acres requested for Phase II Bond release in this submittal successfully achieved <br />Phase I Bond release on October 27, 2003, with the approval of Bond Release <br />Application No. 2 (SL -02) and on November 14, 2015, with the approval of Bond Release <br />Application No. 8 (SL -08). These acres were seeded with approved seed mixes and <br />monitored/sampled as per SCC's permit requirements. Dates and seed mixes for each <br />individual area can be found in Tab 6 of this application in the 2015 Annual Reclamation <br />Report. <br />