My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-15_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2016-08-15_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:51 PM
Creation date
8/16/2016 7:59:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
8/15/2016
Doc Name
Application
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
SL9
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brock Bowles -2- August 12, 2016 <br />8. Bond Company: Liberty Mutual Insurance Company <br />9. Bond Number: 014-018-026 <br />10. Current Total Bond Amount: $805,952.60 <br />11. Original Total Bond Amount: $1,500,000.00 <br />12. Dollar Amount Requested for Release: $58,631.78 <br />13. Legal Description of Area Requested: <br />T10S, R98W, 6th P.M. <br />Section 27: Portions of S'/2SW%4 <br />Section 28: Portions of SE% <br />Section 34: Portions of SW'/4 and portions of NE%NE% <br />14. A Map Showing Area: Enclosed, see Bond Release Exhibit SL -09 - Tab 5 <br />15. Dates Reclamation Work Performed: <br />Roadside North Portal Permanent Drainage and Pond 13 - 4.9 acres for Phase II & <br />III release - #22 on SCC Annual Reclamation Report (ARR). <br />In October 2012 approximately 2.9 acres were re -disturbed and re -seeded during <br />reclamation of the North Portal sedimentation control features. Also, approximately 2.0 <br />acres, which includes Pond 13, a portion of the old upper diversion ditch and the flume <br />area at the end of the upper diversion ditch, were backfilled, graded, top -soiled and <br />seeded. Phase I bond release on the 2.9 acres was approved on October 27, 2003 with <br />SL -2. Phase I bond release on the 2.0 acres was approved on November 14, 2015 with <br />SL -8. (Area #1 on Bond Release Map) <br />Cameo Borrow Area 1 Sump (CBA1 Sump) - 0.3 acres for Phase II & III release - <br />#10 on SCC ARR. <br />In October 2012 approximately 0.3 acres at CBA1 Sump was backfilled, graded, top - <br />soiled and seeded. Phase I Bond Release on the 0.3 acres was approved on November <br />14, 2015 with SL -8. (Area #2 on Bond Release Map) <br />Sediment Ponds 6 & 10 - 2.4 acres for Phase II & III release - #34 on SCC ARR. <br />In October 2012 approximately 2.4 acres at Ponds 6 & 10 were backfilled, graded, top - <br />soiled and seeded. Phase I bond release on the 2.4 acres was approved on November <br />14, 2015 with SL -8. (Area #3 on Bond Release Map) <br />Sediment Pond 11 -1.2 acres for Phase II & III - #20 on SCC ARR. <br />In October 2012 approximately 1.2 acres at Pond 11 were backfilled, graded, top -soiled <br />and seeded. Phase I bond release on the 1.2 acres was approved on November 14, <br />2015 with SL -8. (Area #4 on Bond Release Map) <br />Cameo Borrow Area 2 (CBA2) - 0.6 acres for Phase II & III release - #20 on SCC <br />ARR. <br />In October 2012 approximately 0.6 acres at CBA2 were re -disturbed and re -seeded <br />during reclamation of Pond 11. Phase I bond release on the 0.6 acres was approved on <br />October 27, 2003 with SL -2. (Area #5 on Bond Release Map) <br />
The URL can be used to link to this page
Your browser does not support the video tag.