Laserfiche WebLink
Page 2 of 67 <br /> <br />CIRCES Cost Estimating Software <br />551 Haul Spoil from Temp spoil pile to Collom pit <br />(2017 W-C) <br />TRUCK1 2 8,300.97 $68,935,004.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />25274.18 <br /> <br />$85,646,000 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $1,730,049.20 <br />Performance bond: 1.05 Total = $899,283.00 <br />Job superintendent: 12,546.57 Total = $934,468.53 <br />Profit: 10.00 Total = $8,564,600.00 <br /> TOTAL O & P = $12,128,400.73 <br /> CONTRACT AMOUNT (direct + O & P) = $97,774,400.73 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 Total = 500.00 <br />Engineering work and/or contract/bid preparation: 2.00 Total = $1,955,488.01 <br />Reclamation management and/or administration: 5.00 $4,888,720.04 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $18,973,108.78 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $104,619,108.78 <br /> <br />