Laserfiche WebLink
Page 1 of 67 <br /> <br />CIRCES Cost Estimating Software <br />COST SUMMARY WORK <br /> <br />Task description: Permit Revision-Collom Mining District <br />Site: Colowyo Coal Mine Permit Action: PR4 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 500PR4 State: Colorado Abbreviation: None <br />Date: 8/5/2016 County: Moffat Filename: C019-500pr4 <br />User: JHB <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />501 Collom-Haul Topsoil from TS-25A to temp sp. SS SCRAPER1 3 102.03 $476,749.00 <br />502 Collom-Haul Topsoil from TS 25A to 286.4 ac. SS <br />area <br />SCRAPER1 2 163.32 $272,752.00 <br />503 Haul Topsoil from TS 24A to 71.9 ac SS SCRAPER1 2 97.34 $162,565.00 <br />504 Collom-Haul Topsoil from TS11A to 68.0 SS SCRAPER1 2 15.90 $50,427.00 <br />505 Collom-Haul Topsoil from TS 25A to132.7 ac SS SCRAPER1 2 2.15 $6,803.00 <br />506 Haul Topsoil from TS 25A to 56.3 AC variable TS SCRAPER1 3 83.61 $204,689.00 <br />507 Haul Topsoil from TS 25A to1150 ac GL, Var. <br />depth <br />SCRAPER1 5 1,803.69 $7,074,015.00 <br />509 Collom-Haul Topsoil from TS 25A to Haul Road SCRAPER1 4 181.03 $574,108.00 <br />513 Section 25 Pond Removal DOZER 1 25.65 $6,154.00 <br />514 Middle Pond Removal DOZER 1 18.99 $4,557.00 <br />515 Section 36 Pond Removal DOZER 1 32.12 $7,707.00 <br />517 Demolish/dispose of facilities at Collom area Map <br />22B <br />DEMOLISH 1 80.00 $1,185,349.36 <br />522 Seed & reseed 1387.8 acres disturbance grassland <br />mix <br />REVEGE 1 1,665.40 $1,188,051.00 <br />523 Seed & reseed 906.8 acres disturbance <br />Sagebrush/Steppe mix <br />REVEGE 1 1,088.60 $748,665.00 <br />524 Collom-Rough grade2305 acres reclaimed area <br />(Map 46) <br />GRADER 4 136.61 $100,565.00 <br />527 Section 25 Pond Removal DOZER 1 30.87 $7,407.00 <br />528 Sidehill Pond Removal DOZER 1 4.50 $1,080.00 <br />529 Regrade ditch D4 DOZER 1 5.63 $1,127.00 <br />530 Regrade ditch D5 DOZER 1 12.33 $2,468.00 <br />532 Regrade ditch D7 DOZER 1 2.38 $496.00 <br />534 Remove and dispose of Rip rap from ditches, D1, <br />D2, D3, D4 <br />TRUCK1 1 5.76 $3,050.00 <br />538 Regrade ditch D1 Upper (00-6397) DOZER 1 12.18 $2,438.00 <br />539 Regrade ditch D2 (00-2700) DOZER 1 5.78 $1,158.00 <br />544 Collom-Weed control in Sb/Steppe mix 10% of <br />906.8 ac. 3X <br />REVEGE 1 272.00 $24,962.00 <br />545 Construct post mining drainages NA 1 10,648.90 $4,365,766.50 <br />546 Sealing monitoring wells BOREHOLE 1 53.00 $131,729.70 <br />548 Mobilize/demobilize equipment from Craig MOBILIZE 1 6.44 $67,901.00 <br />549 Collom-Weed control in GL recl 10% of 1387.8 <br />ac. 3X <br />REVEGE 1 417.00 $38,256.00